Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rehabilitation Work Of Underground Ofc
|
| Description |
Rehabilitation Work Of Underground Ofc Work Including Searching Location Of Faults For Restoration Or Recovery Of Ofc Route In Different Locations In Sabroom Te Srinagar Te Ofc Route Of 10 Km In Eight Patches Route Length 29.2 Km In Tripura Ba
|
| Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
| Tender Id | 2025_BSNL_235694_1 |
|
Reference Number |
NE1CO-23/11(26)/7/2025-CFA /632089 /01 dated 17.05.2025 |
| Tender Fee | 590 |
| EMD | 55977 |
| Tender Value | |
| Place | TRIPURA |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=267268 |
| Start Date | May 20, 2025 17:30 |
| End Date |
Expired
02/06/2025
Expired 379 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
1) repair/rehabilitation work on bhanawata to pakhariya sag
1) repair/rehabilitation work on bhanawata to pakhariya sag
Read moreRepair and rehabilitation work at elevated road, ajmer (work under risk and cost basis)
Repair and rehabilitation work at elevated road, ajmer (work under risk and cost basis)
Read moreDnit for rehabilitation of existing 36 mld sbr based stp, rehabilitation of chlorination system and chlorine contact tank, laboratory equipment, glassware and chemicals and all other works contingent thereto. (recall)
Dnit for rehabilitation of existing 36 mld sbr based stp, rehabilitation of chlorination system and chlorine contact tank, laboratory equipment, glassware and chemicals and all other works contingent thereto. (recall)
Read moreDharmapuri district - construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 81 to 160 houses (8 houses (gplus 1) -10 units - centre) including the leveling of site. pkg.no. tn04-02 / srilankan rehabili
Construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 81 to 160 houses (8 houses (gpl1) -10 units - centre) including the leveling of site. pkg.no. tn04-02 / srilankan rehabilitation 2025-2026 pappired
Read moreDharmapuri district - construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 1 to 80 houses (8 houses (g 1) -10 units - nw side) including the leveling of site pkg.no. tn04-01 / srilankan rehabilitatio
Construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 1 to 80 houses (8 houses (g p1) -10 units - nw side) including the leveling of site pkg.no. tn04-01 / srilankan rehabilitation camp2025-2026 pappi
Read moreDharmapuri district - construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 161 to 248 houses (8 houses (g 1) -11 units - ne side) including the leveling of site pkg.no. tn04-03 / srilankan rehabilita
Construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 161 to 248 houses (8 houses (g plus 1) -11 units - ne side) including the leveling of site pkg.no. tn04-03 / srilankan rehabilitation 2025-2026
Read moreRehabilitation and renovation of mortuary (ground floor) at baghajatin s.g. hospital, south 24 parganas during the year 2026-2027.
Read moreDesign, installation and commissioning of permanent cathodic protection (pcp) system for underground steel pipeline networks of madurai (group e)
Design, installation and commissioning of permanent cathodic protection (pcp) system for underground steel pipeline networks of madurai (group e)
Read moreWork of substation earthing, overhauling of power tf installation of double-circuit underground cables, and construction/strengthening of 11k ht/lt lines within the industrial area(phase-2) under the jurisdiction of edd-mughalsarai bp 2026-27.
Work of substation earthing, overhauling of power tf installation of double-circuit underground cables, and construction/strengthening of 11k ht/lt lines within the industrial area(phase-2) under the jurisdiction of edd-mughalsarai bp 2026-27.
Read moreLaying of ofc from gail terminals in rcf trombay to gail terminals in mgl wadala along the existing pipeline.
Laying of ofc from gail terminals in rcf trombay to gail terminals in mgl wadala along the existing pipeline.
Read moreof your Industry type