Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Drawing A 3 Phase Lt Oh Line 5 Wire System Drawn From Loading Point To 12 C Pond For Feeding Power Supply For Drive Of Water Collecting Pump And Installation Of Flood Lights Under Rajrappa Washery
|
| Description |
Drawing A 3 Phase Lt Oh Line 5 Wire System Drawn From Loading Point To 12 C Pond For Feeding Power Supply For Drive Of Water Collecting Pump And Installation Of Flood Lights Under Rajrappa Washery
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2024_CCL_297765_1 |
|
Reference Number |
GM(R)/SO(W)/Rjp/23-24/Et/118 dt 05.01.24 |
| Tender Fee | - |
| EMD | 3600 |
| Tender Value | - |
| Place | SO EnM OFFICE |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | January 06, 2024 23:30 |
| End Date |
Expired
15/01/2024
Expired 984 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair and maintenance of existing lt oh line drawn in the premises of rajrappa washery project, 3.3kv oh line of bhera feeder, lighting arrestor installation trimming of branches of trees for monsoon preparation under rwp
Repair and maintenance of existing lt oh line drawn in the premises of rajrappa washery project, 3.3kv oh line of bhera feeder, lighting arrestor installation 
 and trimming of branches of trees for monsoon preparation under rajrappa washery project
Read moreOne span extension and repair/maintenance of the existing oh line 6.6 kv oh line drawn from main sub-station to rwp and installation of goab switch near at main sub station under rajrappa washery
One span extension and repair/maintenance of the existing oh line 6.6 kv oh line drawn from main sub-station to rwp and installation of goab switch near at main sub station under rajrappa washery
Read moreRepairing of wagon in hauler complete with drive n winch pullies, gear boxes and winch house ps 11 under loading section of rajrappa washery project.
Repairing of wagon in hauler complete with drive n winch pullies, gear boxes and winch house ps 11 under loading section of rajrappa washery project.
Read moreErection of cradle guard of 3.3 kv and 6.6kv ht oh at various location of rajrappa washery project
Erection of cradle guard of 3.3 kv and 6.6kv ht oh at various location of rajrappa washery project
Read moreDismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Read moreDismantling, fabrication, erection and alignment of deck plates belt structures, repairing of roller frames related to belt conveyors under loading section of rajrappa washery project.
Dismantling, fabrication, erection and alignment of deck plates belt structures, repairing of roller frames related to belt conveyors under loading section of rajrappa washery project.
Read moreDismantling and fitting of bearing 22228 and 22220 in tail drum of 1103 and snub drum of loading and raw coal section, respectively, of rajrappa washery.
Dismantling and fitting of bearing 22228 and 22220 in tail drum of 1103 and snub drum of loading and raw coal section, respectively, of rajrappa washery.
Read moreRepairing/ replacement of reclaim feeder rack, drive shaft and pinion gate and adjoining receiving cum collecting chute under middling silo at moonidih coal washery.
Repairing/ replacement of reclaim feeder rack, drive shaft and pinion gate and adjoining receiving cum collecting chute under middling silo at moonidih coal washery.
Read moreRectification/modification of drive base frame arrangement and under feeding hopper after g/box, drive and non-drive pulley dismantling and re-installation, alignment of unit 121aandb belt conveyor main plant of kedla washery.
Rectification/modification of drive base frame arrangement and under feeding hopper after g/box, drive and non-drive pulley dismantling and re-installation, alignment of unit 121aandb belt conveyor main plant of kedla washery.
Read moreCarriage of spillaged coal from the loading section by manual labour including loading unloading and stacking to belt/chute/suitable place for a lead less than 0.50 km for a period of 06months at rajrappa washery
Carriage of spillaged coal from the loading section by manual labour including loading unloading and stacking to
 belt/chute/suitable place for a lead less than 0.50 km for a period of 1 year at rajrappa washery
 project.
Read moreof your Industry type