Tender Details
Particulars | Details |
---|---|
Title |
Cleaning Of Drain At Ps3 To Ps4 Under Main Washery Plant Ps5 And The Approach Areas, Slurry Pond No.12 In And Around Light Vehicle Section By Mechanical Means And Stoke At Suitable Place Of Rajrappa Washery.
|
Description |
Cleaning Of Drain At Ps3 To Ps4 Under Main Washery Plant Ps5 And The Approach Areas, Slurry Pond No.12 In And Around Light Vehicle Section By Mechanical Means And Stoke At Suitable Place Of Rajrappa Washery.
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_CCL_290353_1 |
Reference Number |
GM(R)/SO(W)/Rjp/23-24/Et/79 dt 05.10.2023 |
Tender Fee | |
EMD | 2500 |
Tender Value | |
Place | SO EnM OFFICE |
Link | https://coalindiatenders.nic.in |
Start Date | October 06, 2023 23:30 |
End Date |
16/10/2023 ( Expired 554 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cleaning of spillage coal and clearing of grizzley during unloading of tippers at truck receiving station of silo section and other places by mechanical means in back shifts for a period of 365 days at dipka expansion project.
Cleaning of spillage coal and clearing of grizzley during unloading of tippers at truck receiving station of silo section and other places by mechanical means in back shifts for a period of 365 days at dipka expansion project.
Read moreDewatering and cleaning of muck-mud, slime foreign materials etc. of thickener to provide working place of maintenance of mechanical equipments at fine coal section of kathara washery
Dewatering and cleaning of muck-mud, slime foreign materials etc. of thickener to provide working place of maintenance of mechanical equipments at fine coal section of kathara washery
Read moreRe-handling of spilled coal or slurry around areas of 7.5mtr. floor area and re-handling of spilled coal/slim from surrounding areas of unit no. 213 chain conveyor and surrounding area of 30.00 mtr. floor area of main plant at kedla washery.
Re-handling of spilled coal or slurry around areas of 7.5mtr. floor area and re-handling of spilled coal/slim from surrounding areas of unit no. 213 chain conveyor and surrounding area of 30.00 mtr. floor area of main plant at kedla washery.
Read moreCleaning of spillage coal and clearing of grizzley during unloading of tippers at truck receiving station of silo section and other places by mechanical means for a period of 365 days at dipka expansion project.
Cleaning of spillage coal and clearing of grizzley during unloading of tippers at truck receiving station of silo section and other places by mechanical means for a period of 365 days at dipka expansion project.
Read moreCleaning of the drain at ps3 to ps4 under main washing plant (ps5) n its approach areas and surrounding area of workshop, light vehicles by manual labor including loading, unloading n stacking for a lead less than 0.5 km at rajrappa washery
Cleaning of the drain at ps3 to ps4 under main washing plant (ps5) n its approach areas and surrounding area of workshop, light vehicles by manual labor including loading, unloading n stacking for a lead less than 0.5 km at rajrappa washery
Read moreReplacement of damaged 12 inch dia slurry flow pipeline between pond no. 5 and 6 and cleaning of pipeline at moonidih coal washery.
Replacement of damaged 12 inch dia slurry flow pipeline between pond no. 5 and 6 and cleaning of pipeline at moonidih coal washery.
Read moreCleaning of spillage coal from different floors and equipment of ps5 main washing plant n ps4 building by the manual labor including loading unloading n stacking to belt/chutes/suitable place for lead less than 0.50 km at rajrappa washery
Cleaning of spillage
 coal from different floors and equipment of ps5 main washing plant n ps4 building by the manual labor including loading unloading n stacking to
 belt/chutes/suitable place for lead less than 0.50 km at rajrappa washery
Read moreCarriage of spillaged coal from the loading section by manual labour including loading unloading and stacking to belt/chute/suitable place for a lead less than 0.50 km for a period of 06months at rajrappa washery
Carriage of spillaged coal from the loading section by manual labour including loading unloading and stacking to
 belt/chute/suitable place for a lead less than 0.50 km for a period of 1 year at rajrappa washery
 project.
Read moreCarriage of spillaged coal from the raw coal section by manual labour including loading unloading and stacking to belt/chute/suitable place for lead less than 0.1 km for a period of 06 months at rajrappa washery
Carriage of
 spillaged coal from the raw coal section by manual labour including loading unloading and stacking to belt/chute/suitable place for lead less than 0.1 km for a period of 06
 months at rajrappa washery project.
Read moreFabrication / erection and replacement of take-up-drum structure and repairing / replacement of column er weight body structure of 51 b/c and slurry bypass b/c of main plant section at sawang washery.
Fabrication / erection and replacement of take-up-drum structure and repairing / replacement of column er weight body structure of 51 b/c and slurry bypass b/c of main plant section at sawang washery.
Read moreof your Industry type