Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
One Span Extension And Repair/Maintenance Of The Existing Oh Line 6.6 Kv Oh Line Drawn From Main Sub Station To Rwp And Installation Of Goab Switch Near At Main Sub Station Under Rajrappa Washery
|
| Description |
One Span Extension And Repair/Maintenance Of The Existing Oh Line 6.6 Kv Oh Line Drawn From Main Sub Station To Rwp And Installation Of Goab Switch Near At Main Sub Station Under Rajrappa Washery
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_310043_1 |
|
Reference Number |
SO(EnM)/Rjp/24-25/Et/28dt 10.06.24 |
| Tender Fee | 0 |
| EMD | 4400 |
| Tender Value | - |
| Place | RAJRAPPA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=321321 |
| Start Date | June 11, 2024 23:30 |
| End Date |
Expired
20/06/2024
Expired 827 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreRepair and maintenance of existing lt oh line drawn in the premises of rajrappa washery project, 3.3kv oh line of bhera feeder, lighting arrestor installation trimming of branches of trees for monsoon preparation under rwp
Repair and maintenance of existing lt oh line drawn in the premises of rajrappa washery project, 3.3kv oh line of bhera feeder, lighting arrestor installation 
 and trimming of branches of trees for monsoon preparation under rajrappa washery project
Read more33 kv sub-station at rajrappa ocp, rajrappa area, ccl
Planning, design, engineering, construction, fabrication, erection, supply, installation, testing and
 commissioning of 33 kv sub-station at rajrappa ocp and maintenance of substation
 (plant) for five years.
Read moreReplacement of damaged/burnt 33 kv goab switch do fuse at sector b main sub station (33/6.6/3.3 kv) of rajnagar ocm , hasdeo area
Replacement of damaged/burnt 33 kv goab switch do fuse at sector b main sub station (33/6.6/3.3 kv) of rajnagar ocm , hasdeo area
Read moreSupply and erection of goab switch isolator for 6.6 kv oh feeder of silo chp, bhubaneswari ocp
Supply and erection of goab switch isolator for 6.6 kv oh feeder of silo chp, bhubaneswari ocp
Read moreRepairing and re-strengthening of 3.3kv oh line from pundi 2.6mva main sub-station to pundi colony sub-station (1600 mtrs. span).
Repairing and re-strengthening of 3.3kv oh line from pundi 2.6mva main sub-station to pundi colony sub-station (1600 mtrs. span).
Read morePainting of electric pole of 6.6 kv and 11 kv oh line from regional sub-station to quarry no. 02 and 03 via sub station no. 02 of kathara colliery
Painting of electric pole of 6.6 kv and 11 kv oh line from regional sub-station to quarry no. 02 and 03 via sub station no. 02 of kathara colliery
Read moreCon of existing ideal 3.3kv oh line (between ara-kanta sub-station and dumerbera sub-station) into 11kv oh line for supplying 11kv power to sarubera 10no. sub-station separately (by a dedicated feeder) from ara kanta sub-station
Con of existing ideal 3.3kv oh line (between ara-kanta sub-station and dumerbera sub-station) into 11kv oh line for supplying 11kv power to sarubera 10no. sub-station separately (by a dedicated feeder) from ara kanta sub-station
Read moreProviding interlocking arrangement between circuit breakers and goab/isolator at 2x12.5mva, 33/6.6kv main substation of rajrappa area
Providing interlocking arrangement between circuit breakers and goab/isolator at 2x12.5mva, 33/6.6kv main substation of rajrappa area
Read moreDay to day maintenance and erection work for 33 kv overhead line drawn from 132/33 kv nandira sub-station to 33kv/6.6 kv sub-station of bhubaneswari ocp for a period of 730 days.
Day to day maintenance and erection work for 33 kv overhead line drawn from 132/33 kv nandira sub-station to 33kv/6.6 kv sub-station of bhubaneswari ocp for a period of 730 days.
Read moreof your Industry type