Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ceiling Girders For Ntpc Lara 2x800 Mw Chattisgarh And Ntpc Singrauli 2x800 Mw Uttar Pradesh With Vendor Materials (Ovm)
|
Description |
Fabrication And Supply Of Ceiling Girders For Ntpc Lara 2x800 Mw Chattisgarh And Ntpc Singrauli 2x800 Mw Uttar Pradesh With Vendor Materials (Ovm)
|
Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
Tender Id | 2024_BHEL_39681_1 |
Reference Number |
2024OVM010 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Trichy |
Link | https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=41352 |
Start Date | September 06, 2024 14:45 |
End Date |
24/09/2024 ( Expired 276 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreImplementation of 500mw with a 50 persantage greenshoe option, for grid connected roof top solar pv systems under resco model at various locations in the state of maharashtra, goa, gujarat, uttar pradesh and andhra pradesh
Implementation of 500mw with a 50 persanatge greenshoe option, for grid connected roof top solar pv systems under resco model at various locations in the state of maharashtra, goa, gujarat, uttar pradesh and andhra pradesh
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreFabrication and supply of ducts for adani and ntpc projects with vendors materials
Fabrication and supply of ducts for adani and ntpc projects with vendors materials
Read moreDrafting of drawings associated with civil and structural works for singrauli st-ii 2 x 800 mw
Drafting of drawings associated with civil and structural works for singrauli st-ii 2 x 800 mw
Read moreAux idct for 2x800 mw ntpc singrauli stpp stage iii epc
Aux idct for 2x800 mw ntpc singrauli stpp stage iii epc
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreReceipt, unloading, verifying, shifting, stacking, preservation, handling and handing over of components of boiler with auxiliaries for materials management at 2x660mw stpp, htps, korba west, chattisgarh, india
Receipt, unloading, verifying, shifting, stacking, preservation, handling and handing over of components of boiler with auxiliaries for materials management at 2x660mw stpp, htps, korba west, chattisgarh, india
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreof your Industry type