Tender Details

Particulars Details
Title
Ceiling Girders For Ntpc Lara 2x800 Mw Chattisgarh And Ntpc Singrauli 2x800 Mw Uttar Pradesh With Vendor Materials (Ovm)
Description
Fabrication And Supply Of Ceiling Girders For Ntpc Lara 2x800 Mw Chattisgarh And Ntpc Singrauli 2x800 Mw Uttar Pradesh With Vendor Materials (Ovm)
Organisation Bharat Heavy Electricals Limited | Public Sector Undertakings
Tender Id 2024_BHEL_39681_1
Reference
Number
2024OVM010
Tender Fee 0
EMD 0
Tender Value
Place Trichy
Link https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=41352
Start Date September 06, 2024 14:45
End Date

24/09/2024 ( Expired 276 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Implementation of 500mw with a 50 persantage greenshoe option, for grid connected roof top solar pv systems under resco model at various locations in the state of maharashtra, goa, gujarat, uttar pradesh and andhra pradesh

Implementation of 500mw with a 50 persanatge greenshoe option, for grid connected roof top solar pv systems under resco model at various locations in the state of maharashtra, goa, gujarat, uttar pradesh and andhra pradesh

Read more
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Read more
Fabrication and supply of ducts for adani and ntpc projects with vendors materials

Fabrication and supply of ducts for adani and ntpc projects with vendors materials

Read more
Drafting of drawings associated with civil and structural works for singrauli st-ii 2 x 800 mw

Drafting of drawings associated with civil and structural works for singrauli st-ii 2 x 800 mw

Read more
Aux idct for 2x800 mw ntpc singrauli stpp stage iii epc

Aux idct for 2x800 mw ntpc singrauli stpp stage iii epc

Read more
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode

Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode

Read more
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Read more
Receipt, unloading, verifying, shifting, stacking, preservation, handling and handing over of components of boiler with auxiliaries for materials management at 2x660mw stpp, htps, korba west, chattisgarh, india

Receipt, unloading, verifying, shifting, stacking, preservation, handling and handing over of components of boiler with auxiliaries for materials management at 2x660mw stpp, htps, korba west, chattisgarh, india

Read more
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh

Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise