Tender Details

Particulars Details
Title
Procurement Of Carrying, V Return And Impact Idlers For Conveyor System Of Chp/Dpps.
Description
Procurement Of Carrying, V Return And Impact Idlers For Conveyor System Of Chp/Dpps.&Amp#X0d &Amp#X0d &Amp#X0d
Organisation THE DURGAPUR PROJECTS LIMITED | State Govt. and UT
Tender Id 2024_DPL_742005_1
Reference
Number
WBDPL/DPPS/PUR/NIT (E)-042 SR/115/2024-25
Tender Fee 0
EMD 28900
Tender Value -
Place Office of the DGM(S and P),DPL
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1639361

Start Date August 31, 2024 17:30
End Date
Expired 21/09/2024

Expired 751 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tggenco-ktps-vii stage-mm-chp- procurement of bearing and sleeves for conveyor pulleys, various gearboxes, sump pumps, fluid couplings and esc-584 scoop couplings

Tggenco-ktps-vii stage-mm-chp- procurement of bearing and sleeves for conveyor pulleys, various gearboxes, sump pumps, fluid couplings and esc-584 scoop couplings

Read more
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru

Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru

Read more
Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.

Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Annual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.

Annual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.

Read more
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).

Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).

Read more
Procurement of carrying, v return and impact idler for chp/dpps

Procurement of carrying, v return and impact idler for chp/dpps

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise