Tender Details
Particulars | Details |
---|---|
Title |
Improvement And Renovation Of Homen Borgohain Road (S.H. 03) (From Ch. 0.00 Km (Narengi Tiniali) To Ch. 17.60 Km(gobardhan Chariali) And Link Road At Dalbari, Satgaon Under Sopd(g) For The Year 2024 25
|
Description |
Improvement And Renovation Of Homen Borgohain Road (S.H. 03) (From Ch. 0.00 Km (Narengi Tiniali) To Ch. 17.60 Km(gobardhan Chariali) And Link Road At Dalbari, Satgaon Under Sopd(g) For The Year 2024 25
|
Organisation | Public Works Roads Department | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 30000 |
EMD | 98.73 Lakh |
Tender Value | |
Place | Guwahati |
Link |
AAAAAAAAAA Login to view |
Start Date | May 24, 2025 14:30 |
End Date |
06/06/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement and renovation of (1) hatgaon bhetapara road , (2) kalakhetra road (3) dr. r. p. road (4) dr. b. n. saikia road (5) g. s. road under sopd(g) for the year 2024-25.
Improvement and renovation of (1) hatgaon bhetapara road , (2) kalakhetra road (3) dr. r. p. road (4) dr. b. n. saikia road (5) g. s. road under sopd(g) for the year 2024-25.
Read moreImprovement and renovation of homen borgohain road (s.h. -03) (from ch. 0.00 km (narengi tiniali) to ch. 17.60 km(gobardhan chariali) and link road at dalbari, satgaon under sopd(g) for the year 2024-25
Improvement and renovation of homen borgohain road (s.h. -03) (from ch. 0.00 km (narengi tiniali) to ch. 17.60 km(gobardhan chariali) and link road at dalbari, satgaon under sopd(g) for the year 2024-25
Read moreSopd_g_25_26_09 improvement of old nh-38 starting from makum railway gate to digboi by-pass connecting road under sopd-g for the year 2025-26 under tinsukia doom-dooma, makum and sadia territorial road division in makum lac
Improvement of old nh-38 starting from makum railway gate to digboi by-pass connecting road under sopd-g for the year 2025-26 under tinsukia doom-dooma, makum and sadia territorial road division in makum lac
Read moreMtc of road from kowai chowmuhani simna road (at mantala shib mandir) to patanjali camp under mohanpur r.d block during the year 2024-25/sh gsb, wbm-iii, carpeting, drain , cd and earth filling etc(l-0.150 km)(ch 0.0 to 150.00 mtr)/gr-i
Mtc of road from kowai chowmuhani simna road (at mantala shib mandir) to patanjali camp under mohanpur r.d block during the year 2024-25/sh gsb, wbm-iii, carpeting, drain , cd and earth filling etc(l-0.150 km)(ch 0.0 to 150.00 mtr)/gr-i
Read moreMtc of road from kowai chowmuhani simna road (at mantala shib mandir) to patanjali camp under mohanpur r.d block during the year 2024-25/sh gsb, wbm-iii, carpeting, drain , cd and earth filling etc(l-0.150 km)(ch 150.00 to 360.00 mtr)/gr-ii
Mtc of road from kowai chowmuhani simna road (at mantala shib mandir) to patanjali camp under mohanpur r.d block during the year 2024-25/sh gsb, wbm-iii, carpeting, drain , cd and earth filling etc(l-0.150 km)(ch 150.00 to 360.00 mtr)/gr-ii
Read moreMtc of road from sanyasi mura to bagaban chowdhury end pointduring the year 2025-26 / sh patch grouting,wbm-iii, carpeting ,seal coat etc.( ch. 0.00 to 2.50 k.m and ch. 4.20 to 5.40 km)
Mtc of road from sanyasi mura to bagaban chowdhury end pointduring the year 2025-26 / sh patch grouting,wbm-iii, carpeting ,seal coat etc.( ch. 0.00 to 2.50 k.m and ch. 4.20 to 5.40 km)
Read moreDevelopment of road during the year 2025 _2026. improvement of brick soled road starting from h_o swapan karmakar to h_o ramen singh at manipuri para and adjacent roads ( length is 0.475 km ) within the amc ward no 03 , under juridiction of construc
Development of road during the year 2025 _2026. improvement of brick soled road starting from h_o swapan karmakar to h_o ramen singh at manipuri para and adjacent roads ( length is 0.475 km ) within the amc ward no 03 , under juridiction of construc
Read moreAnnual maintenance plan-i for the year 2025-26 on thatharna to thanga i.e link road to village devna km. 0/0 to 3/130 vr (non pmgsy)(sh repair of pot holes and bitumenous concrete 25 mm thick using plastic based from km. 2/00 to 3/130 ) 1.13
Annual maintenance plan-i for the year 2025-26 on thatharna to thanga i.e link road to village devna km. 0/0 to 3/130 vr (non pmgsy)(sh repair of pot holes and bitumenous concrete 25 mm thick using plastic based from km. 2/00 to 3/130 ) 1.13
Read moreMtc of road from boim cherra to jhulan tilla (ch. 0.00 to 1.00 km, length 1.00 km) and pmgsy road from kayachanbari to kathal bagan(ch. 0.00 to 2.80 km, length 2.80 km) under pwd (r and b) jirania sub division during the year 2025-2026..
Mtc of road from boim cherra to jhulan tilla (ch. 0.00 to 1.00 km, length 1.00 km) and pmgsy road from kayachanbari to kathal bagan(ch. 0.00 to 2.80 km, length 2.80 km) under pwd (r and b) jirania sub division during the year 2025-2026..
Read moreAnnual maintenance plan-i for the year 2025-26 on thatharna to thanga i.e link road to village devna km. 0/0 to 3/130 vr (non pmgsy)(sh repair of pot holes and bitumenous concrete 25 mm thick using plastic based from km. 2/00 to 3/130 ) 1.130
Annual maintenance plan-i for the year 2025-26 on thatharna to thanga i.e link road to village devna km. 0/0 to 3/130 vr (non pmgsy)(sh repair of pot holes and bitumenous concrete 25 mm thick using plastic based from km. 2/00 to 3/130 ) 1.130
Read moreof your Industry type