Tender Details
Particulars | Details |
---|---|
Title |
Expression Of Interest (Eoi) Grid Connected Solar Power Plants Through Resco Mode For 25 Years Under Pm Kusum Component A Balotra And Siwana Division Of Balotra Circle
|
Description |
Expression Of Interest (Eoi) Grid Connected Solar Power Plants Through Resco Mode For 25 Years Under Pm Kusum Component A Balotra And Siwana Division Of Balotra Circle.
|
Organisation | Jodhpur VVNL - MD | State Govt. and UT |
Tender Id | 2025_JdVVN_455350_1 |
Reference Number |
TN-DSM-105 |
Tender Fee | 7950 |
EMD | 87 Lakh |
Tender Value | |
Place | Balotra |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=817223 |
Start Date | March 29, 2025 00:25 |
End Date |
05/05/2025 ( Expired 6 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Read moreWork of attending to resolving the fuse off call complaints lt/ht line breakdowns for restoration of electrical power supply in the various divisions under city circle amritsar and east division amritsar under suburban circle amritsar
Work of attending to resolving the fuse off call complaints lt/ht line breakdowns for restoration of electrical power supply in the various divisions under city circle amritsar and east division amritsar under suburban circle amritsar
Read more(rfs) of solar rooftop power developers for setting up of cumulative capacity of 5140 kw grid connected rooftop solar pv power projects (without battery storage) on union government buildings in the southern region resco mode under pmsgmby
(rfs) of solar rooftop power developers for setting up of cumulative capacity of 5140 kw grid connected rooftop solar pv power projects (without battery storage) on union government buildings in the southern region resco mode under pmsgmby
Read more(rfs) of solar rooftop power developers for setting up of cumulative capacity of 2496 kw grid connected rooftop solar pv power projects (without battery storage) on union government buildings in the northern region resco mode under pmsgmby
(rfs) of solar rooftop power developers for setting up of cumulative capacity of 2496 kw grid connected rooftop solar pv power projects (without battery storage) on union government buildings in the northern region resco mode under pmsgmby
Read moreEoi for development of stp under sbm (u) 2.0 maharashtra
Expression of interest (eoi) invited for selection and empanelment of agency for development of sewage treatment plants (stps) on epc basis in 358 urban local bos (below 1 lakh population) in maharashtra under swachh bharat mission &#x0d (u) 2.0
Read moreDesign, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom norms including comprehensive o and m for 11yrs with 02 yrs guarantee period
Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom tnpdcl norms including comprehensive oand m for 11yrs with 02yrs guarantee period
Read moreSurvey design fabrication supply installation testing and commissioning of total 17.69 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 03 years
Survey design fabrication supply installation testing and commissioning of total 17.69kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 03 years
Read moreRfs for setting up of 6.25 mw grid-connected rooftop solar pv projects under resco mode
Rfs for setting up of 6.25 mw grid-connected rooftop solar pv projects under resco mode
Read moreExpression of interest (eoi) for repurposing of rajghat power plant into a one unique entertainment destination on ppp mode
Expression of interest (eoi) for
 repurposing of rajghat power plant into a one unique entertainment destination on ppp mode
Read moreDesign, supply, installation, testing and commissioning of grid connected ground mounted solar power plant of 25 mw (ac) with 40 percentage dc overload capacity at rampur colliery and samaleswari ocp, mcl and comprehensive o and m for ten years.
Design, supply, installation, testing and commissioning of grid connected ground mounted solar power plant of 25 mw (ac) with 40 percentage dc overload capacity at rampur colliery and samaleswari ocp, mcl and comprehensive o and m for ten years.
Read moreof your Industry type