Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Sh Improvement Of Giri Right Side 450 Mm Dia Rising Main From Rd 2640 To Rd 3100 Between Majholi To Dhamandri Total Length 460 Meter With Allallied Works In Complete Job Ii
|
Description |
Sh Improvement Of Giri Right Side 450 Mm Dia Rising Main From Rd 2640 To Rd 3100 (Between Majholi To Dhamandri Total Length 460 Meter With Allallied Works In Complete Job Ii
|
Organisation | Municipal Corporation Shimla | State Govt. and UT |
Tender Id | 2024_MC_84013_2 |
Reference Number |
219 dated 15/01/2024 |
Tender Fee | 5000 |
EMD | 2.5 Lakh |
Tender Value | |
Place | Shimla |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=124804 |
Start Date | January 15, 2024 22:30 |
End Date |
23/01/2024 ( Expired 517 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Survey and design of distribution network including providing, laying testing and commissioning of pipelines from rakkas tank via ventuary meter to 600 mm dia main pumping line area between sagartal to jalapur chauraha including jalalpur village and
Survey and design of distribution network including providing, laying testing and commissioning of pipelines from rakkas tank via ventuary meter to 600 mm dia main pumping line area between sagartal to jalapur chauraha including jalalpur village and
Read moreProvision for laying of water supply pipe line to riti building along with improvement of water supply to roti campus including laying of 250 mm dia rising main from ghatikia mbr to sampur pumping station under watco section, ghatikia, bhubaneswar
Provision for laying of water supply pipe line to riti building along with improvement of water supply to roti campus including laying of 250 mm dia rising main from ghatikia mbr to sampur pumping station under watco section, ghatikia, bhubaneswar
Read moreVkv/2024/259 c/o geometrical improvement of road from main road to village rakharara hppwd division kotla behar and sub division dada siba(sh c/o r/wall from rd 0/460 to 0/478 with cc and wire crate) deposit work
Vkv/2024/259 c/o geometrical improvement of road from main road to village rakharara hppwd division kotla behar and sub division dada siba(sh c/o r/wall from rd 0/460 to 0/478 with cc and wire crate) deposit work
Read moreOperation and maintenance work of jugsalai water supply scheme consisting of main features such as w.t.p of capacity 16.0 mld, back wash recovery system, intake works at kharkai river, raw water rising mains up to 450 mm dia d.i. k9 1.587 kms. fro
Operation and maintenance work of jugsalai water supply scheme consisting of main features such as w.t.p of capacity 16.0 mld, back wash recovery system, intake works at kharkai river, raw water rising mains up to 450 mm dia d.i. k9 1.587 kms. fro
Read moreMaintenance of road from damcherra khedacherra road to boraipara mizoram border from ch.0.00km to ch.0.27km total length 0.27km under damcherra sub division during the year 202 2025 sh side shouldering,wbm 3, paver block, pcc works etc. gr i.
Maintenance of road from damcherra khedacherra road to boraipara mizoram border from ch.0.00km to ch.0.27km total length 0.27km under damcherra sub division during the year 202 2025 sh side shouldering,wbm 3, paver block, pcc works etc. gr i.
Read moreMaintenance of road from damcherra khedacherra road to boraipara mizoram border from ch.0.27km to ch.0.54km total length 0.27km under damcherra sub division during the year 2024 2025 sh side shouldering, wbm 3, paver block, pcc works etc.gr ii.
Maintenance of road from damcherra khedacherra road to boraipara mizoram border from ch.0.27km to ch.0.54km total length 0.27km under damcherra sub division during the year 2024 2025 sh side shouldering, wbm 3, paver block, pcc works etc.gr ii.
Read moreConstruction of road and pulli from main road towards house of verma and others (sh - providing laying hume pipe culvert (900 mm dia) at rd 0/095, c/o r/wall km 0/030 to 0/034, u-shape drain 0/00 to 0/020 and b/wll at rd 0/060 to 0/065 (mmgsy)
Construction of road and pulli from main road towards house of verma and others (sh - providing laying hume pipe culvert (900 mm dia) at rd 0/095, c/o r/wall km 0/030 to 0/034, u-shape drain 0/00 to 0/020 and b/wll at rd 0/060 to 0/065 (mmgsy)
Read moreImprovement of road from dm colony main road to avinash sarkar house via binode sarkar house under mohanpur rd block/sh gsb, wbm-ii ,iii, carpeting, drain , cd, retaining wall and earth filling etc(l-0.75 km)
Improvement of road from dm colony main road to avinash sarkar house via binode sarkar house under mohanpur rd block/sh gsb, wbm-ii ,iii, carpeting, drain , cd, retaining wall and earth filling etc(l-0.75 km)
Read moreConstruction of rcc pedestal (118 nos) for 500 mm dia ms pipe line total length-530 mtr (from ganchha minor-1 reach 1770 mtr to 2050 mtr and from 2150 mtr to 2400 mtr) in main canal of new ramjanki pump canal
Construction of rcc pedestal (118 nos) for 500 mm dia ms pipe line total length-530 mtr (from ganchha minor-1 reach 1770 mtr to 2050 mtr and from 2150 mtr to 2400 mtr) in main canal of new ramjanki pump canal
Read moreConstruction of rcc pedestal (114 nos) for 500 mm dia ms pipe line total length-510 mtr (reach from 1180 mtr to 1220 mtr and from 1300 mtr to 1770 mtr upto ganchha minor 1) in main canal of new ramjanki pump canal
Construction of rcc pedestal (114 nos) for 500 mm dia ms pipe line total length-510 mtr (reach from 1180 mtr to 1220 mtr and from 1300 mtr to 1770 mtr upto ganchha minor 1) in main canal of new ramjanki pump canal
Read moreof your Industry type