Tender Details
About Tender
🔧 Procurement Notice: Rfid Based Weighment System Shifting Services 🔧 Central Coalfields Limited (Ccl), A Public Sector Undertaking, Is Seeking Bids For The Shifting And Reinstallation Of An Rfid Based Weighment System From Chp Wb Bs 2 To The Newly Installed 100 Tonne Wb No.11, Located In Front Of Piparwar Workshop Under Piparwar Area. 📅 Bid Submission Deadline: June 4, 2024, 5:00 Pm Tender Fee: Inr 0 Emd: Inr 1500 Interested Vendors Must Possess The Necessary Technical Expertise And Equipment To Handle The Relocation And Reinstallation Of The Sophisticated Weighment System. Detailed Proposals, Including Methodology, Timelines, And Pricing, Are To Be Submitted By The Stipulated Deadline. Keywords: Rfid Based Weighment System, Shifting Services, Central Coalfields Limited, Public Sector Undertaking, Tender, Bid Submission, Procurement, Industrial Equipment RelocationParticulars | Details |
---|---|
Title |
Shifting And Reinstallation Of Rfid Based Weighment System From The Site Of Chp Wb Bs 2 To Newly Installed 100 Tonne Wb No.11 (In Front Of Piparwar Workshop) Under Piparwar Area.
|
Description |
Shifting And Reinstallation Of Rfid Based Weighment 
System From The Site Of Chp Wb Bs 2 To Newly 
Installed 100 Tonne Wb No.11 (In Front Of Piparwar 
Workshop) Under Piparwar Area.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_309047_1 |
Reference Number |
SO(EnT)/PPR/eNIT/24-25/03 |
Tender Fee | 0 |
EMD | 1500 |
Tender Value | |
Place | Ashok OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=320239 |
Start Date | May 25, 2024 22:30 |
End Date |
04/06/2024 ( Expired 370 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
2 years operation and maintenance of computerized controlling and monitoring system for 11 nos. tubewells ,10 nos. o.h.t. and 1 no. c.w.r. in newly added area in nagar palika parishad muzaffarnagar under deposit programme distt- muzaffarnagar
2 years operation and maintenance of computerized controlling and monitoring system for 11 nos. tubewells ,10 nos. o.h.t. and 1 no. c.w.r. in newly added area in nagar palika parishad muzaffarnagar under deposit programme distt- muzaffarnagar.
Read moreWork of shifting of ht line on chainage no. 74 480 and 72 500 of ganga express way under construction on wsa area from 11 kv feeders site village mangarola and 11 kv rukhalu feeder of 33/11 kv substation burawali and jaitoli under edd hasanpur.
Work of shifting of ht line on chainage no. 74 480 and 72 500 of ganga express way under construction on wsa area from 11 kv feeders site village mangarola and 11 kv rukhalu feeder of 33/11 kv substation burawali and jaitoli under edd hasanpur.&#x0d &#x0d
Read moreInstallation, fixing and synchronization of analog belt scale integrator in belt weighing system installed at 1028 conveyor under chp-cpp, piparwar area.
Installation, fixing and synchronization of analog belt scale integrator in belt weighing system installed at 1028 conveyor under chp-cpp, piparwar area.
Read moreShifting of bike stand from siding no. 2 to 8 no pit area under bankola colliery.
Shifting of bike stand from siding 
 no. 2 to 8 no pit area under bankola colliery.
Read more2 years operation and maintenance of computerized controlling and monitoring system for 11 nos. tubewells ,11 nos. o.h.t. and 1 no. c.w.r. in newly added area in nagar palika parishad muzaffarnagar under deposit programme distt- muzaffarnagar.
2 years operation and maintenance of computerized controlling and monitoring system for 11 nos. tubewells ,11 nos. o.h.t. and 1 no. c.w.r. in newly added area in nagar palika parishad muzaffarnagar under deposit programme distt- muzaffarnagar.
Read moreImprovement of different roads and drainage system under udaipur municipal council area/ construction of rcc drain from rajarbag uphc to maragang box culvert under umc ward no.17 during the year 2024-25 (length 400.00 m)./sh rcc work, cd work etc (2
Improvement of different roads and drainage system under udaipur municipal council area/ construction of rcc drain from rajarbag uphc to maragang box culvert under umc ward no.17 during the year 2024-25 (length 400.00 m)./sh rcc work, cd work etc (2
Read moreDismantling and erection of 440v oh line from 630kva transformer of feeder breaker to sampling office/ siding office and 630 kva transformer to drr-2 , mohan nagar pond and supplying power to road wb no-02 under dakra project, n.k area
Dismantling and erection of 440v oh line from 630kva transformer of feeder breaker to sampling office/ siding office and 630 kva transformer to drr-2 , mohan nagar pond and supplying power to road wb no-02 under dakra project, n.k area
Read moreInstallation, fixing and synchronization of analog belt scale integrator in belt weighing system installed at 1028 conveyor under chp-cpp, piparwar area.
Installation, fixing and synchronization of analog belt scale integrator in belt weighing system installed at 1028 conveyor under chp-cpp, piparwar area.
Read moreRepairing of 03 no. of operator console installed at control room chp-cpp and ent office under chp-cpp, piparwar area.
Repairing of 03 no. of operator console installed at control room chp-cpp and ent office under chp-cpp, piparwar area.
Read moreAnnual testing required for the stamping of 03 no weighbridges (kuya ocp, bastacolla ocp and bnr railway siding weighbridge) under bastacolla area and shifting of 01 time 20 tonne test weights i.e. 20 tonnes test weights from burragarh siding to bast
Annual testing required for the stamping of 03 no weighbridges (kuya ocp, bastacolla ocp and bnr railway siding weighbridge) under bastacolla area and shifting of 01 time 20 tonne test weights i.e. 20 tonnes test weights from burragarh siding to bast
Read moreof your Industry type