Tender Details
About Tender
🔧 Procurement Notice: Rfid Based Weighment System Shifting Services 🔧 Central Coalfields Limited (Ccl), A Public Sector Undertaking, Is Seeking Bids For The Shifting And Reinstallation Of An Rfid Based Weighment System From Chp Wb Bs 2 To The Newly Installed 100 Tonne Wb No.11, Located In Front Of Piparwar Workshop Under Piparwar Area. 📅 Bid Submission Deadline: June 4, 2024, 5:00 Pm Tender Fee: Inr 0 Emd: Inr 1500 Interested Vendors Must Possess The Necessary Technical Expertise And Equipment To Handle The Relocation And Reinstallation Of The Sophisticated Weighment System. Detailed Proposals, Including Methodology, Timelines, And Pricing, Are To Be Submitted By The Stipulated Deadline. Keywords: Rfid Based Weighment System, Shifting Services, Central Coalfields Limited, Public Sector Undertaking, Tender, Bid Submission, Procurement, Industrial Equipment RelocationParticulars | Details |
---|---|
Title |
Shifting And Reinstallation Of Rfid Based Weighment System From The Site Of Chp Wb Bs 2 To Newly Installed 100 Tonne Wb No.11 (In Front Of Piparwar Workshop) Under Piparwar Area.
|
Description |
Shifting And Reinstallation Of Rfid Based Weighment 
System From The Site Of Chp Wb Bs 2 To Newly 
Installed 100 Tonne Wb No.11 (In Front Of Piparwar 
Workshop) Under Piparwar Area.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_309047_1 |
Reference Number |
SO(EnT)/PPR/eNIT/24-25/03 |
Tender Fee | 0 |
EMD | 1500 |
Tender Value | |
Place | Ashok OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=320239 |
Start Date | May 25, 2024 22:30 |
End Date |
04/06/2024 ( Expired 342 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
2 years operation and maintenance of computerized controlling and monitoring system for 11 nos. tubewells ,11 nos. o.h.t. and 1 no. c.w.r. in newly added area in nagar palika parishad muzaffarnagar under deposit programme distt- muzaffarnagar.
2 years operation and maintenance of computerized controlling and monitoring system for 11 nos. tubewells ,11 nos. o.h.t. and 1 no. c.w.r. in newly added area in nagar palika parishad muzaffarnagar under deposit programme distt- muzaffarnagar.
Read moreImprovement of different roads and drainage system under udaipur municipal council area/ construction of rcc drain from rajarbag uphc to maragang box culvert under umc ward no.17 during the year 2024-25 (length 400.00 m)./sh rcc work, cd work etc (2
Improvement of different roads and drainage system under udaipur municipal council area/ construction of rcc drain from rajarbag uphc to maragang box culvert under umc ward no.17 during the year 2024-25 (length 400.00 m)./sh rcc work, cd work etc (2
Read moreDismantling and erection of 440v oh line from 630kva transformer of feeder breaker to sampling office/ siding office and 630 kva transformer to drr-2 , mohan nagar pond and supplying power to road wb no-02 under dakra project, n.k area
Dismantling and erection of 440v oh line from 630kva transformer of feeder breaker to sampling office/ siding office and 630 kva transformer to drr-2 , mohan nagar pond and supplying power to road wb no-02 under dakra project, n.k area
Read moreInstallation, fixing and synchronization of analog belt scale integrator in belt weighing system installed at 1028 conveyor under chp-cpp, piparwar area.
Installation, fixing and synchronization of analog belt scale integrator in belt weighing system installed at 1028 conveyor under chp-cpp, piparwar area.
Read moreRepairing of 03 no. of operator console installed at control room chp-cpp and ent office under chp-cpp, piparwar area.
Repairing of 03 no. of operator console installed at control room chp-cpp and ent office under chp-cpp, piparwar area.
Read moreAnnual testing required for the stamping of 03 no weighbridges (kuya ocp, bastacolla ocp and bnr railway siding weighbridge) under bastacolla area and shifting of 01 time 20 tonne test weights i.e. 20 tonnes test weights from burragarh siding to bast
Annual testing required for the stamping of 03 no weighbridges (kuya ocp, bastacolla ocp and bnr railway siding weighbridge) under bastacolla area and shifting of 01 time 20 tonne test weights i.e. 20 tonnes test weights from burragarh siding to bast
Read moreStrengthening of road from golamber near ashok workshop turning to weigh bridge no.13 under ashok ocp, piparwar area.
Strengthening of road from golamber near ashok workshop turning to weigh bridge no.13 under ashok ocp, piparwar area.
Read moreDismantling, shifting, reinstallation, commissioning and stamping of 01 no. 100 te capacity road weighbridge from bartunga hill mine to chirimiri ocm at chirimiri area
Dismantling, shifting, reinstallation, commissioning and stamping of 01 no. 100 te capacity road weighbridge from bartunga hill mine to chirimiri ocm at chirimiri area
Read moreErection of 11 kv overhead line from 2 no. workshop marigodam for surunga basti paharigora basti under jeenagora section of amal.nt-st-jg colliery under lodna area
Erection of 11 kv overhead line from 2 no. workshop marigodam for surunga basti paharigora basti under jeenagora section of amal.nt-st-jg colliery under lodna area
Read moreErection of 750mtr, 3x150 sq.mm, 1x35(st light), 1x95(insulated neutral messenger) ab cable from 10 no. substation to 6/2 quarry for 550v power supply to 500gpm pump installed at 6/2 quarry of sarubera project under kuju area
Erection of 750mtr, 3x150 sq.mm, 1x35(st light), 1x95(insulated neutral messenger) ab cable from 10 no. substation to 6/2 quarry for 550v power supply to 500gpm pump installed at 6/2 quarry of sarubera project under kuju area
Read moreof your Industry type