Tender Details

About Tender

🔧 Procurement Notice: Rfid Based Weighment System Shifting Services 🔧 Central Coalfields Limited (Ccl), A Public Sector Undertaking, Is Seeking Bids For The Shifting And Reinstallation Of An Rfid Based Weighment System From Chp Wb Bs 2 To The Newly Installed 100 Tonne Wb No.11, Located In Front Of Piparwar Workshop Under Piparwar Area. 📅 Bid Submission Deadline: June 4, 2024, 5:00 Pm Tender Fee: Inr 0 Emd: Inr 1500 Interested Vendors Must Possess The Necessary Technical Expertise And Equipment To Handle The Relocation And Reinstallation Of The Sophisticated Weighment System. Detailed Proposals, Including Methodology, Timelines, And Pricing, Are To Be Submitted By The Stipulated Deadline. Keywords: Rfid Based Weighment System, Shifting Services, Central Coalfields Limited, Public Sector Undertaking, Tender, Bid Submission, Procurement, Industrial Equipment Relocation
Particulars Details
Title
Shifting And Reinstallation Of Rfid Based Weighment System From The Site Of Chp Wb Bs 2 To Newly Installed 100 Tonne Wb No.11 (In Front Of Piparwar Workshop) Under Piparwar Area.
Description
Shifting And Reinstallation Of Rfid Based Weighment &#X0d System From The Site Of Chp Wb Bs 2 To Newly &#X0d Installed 100 Tonne Wb No.11 (In Front Of Piparwar &#X0d Workshop) Under Piparwar Area.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_309047_1
Reference
Number
SO(EnT)/PPR/eNIT/24-25/03
Tender Fee 0
EMD 1500
Tender Value
Place Ashok OCP
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=320239
Start Date May 25, 2024 22:30
End Date

04/06/2024 ( Expired 370 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
2 years operation and maintenance of computerized controlling and monitoring system for 11 nos. tubewells ,10 nos. o.h.t. and 1 no. c.w.r. in newly added area in nagar palika parishad muzaffarnagar under deposit programme distt- muzaffarnagar

2 years operation and maintenance of computerized controlling and monitoring system for 11 nos. tubewells ,10 nos. o.h.t. and 1 no. c.w.r. in newly added area in nagar palika parishad muzaffarnagar under deposit programme distt- muzaffarnagar.

Read more
Work of shifting of ht line on chainage no. 74 480 and 72 500 of ganga express way under construction on wsa area from 11 kv feeders site village mangarola and 11 kv rukhalu feeder of 33/11 kv substation burawali and jaitoli under edd hasanpur.

Work of shifting of ht line on chainage no. 74 480 and 72 500 of ganga express way under construction on wsa area from 11 kv feeders site village mangarola and 11 kv rukhalu feeder of 33/11 kv substation burawali and jaitoli under edd hasanpur.&amp#x0d &amp#x0d

Read more
Installation, fixing and synchronization of analog belt scale integrator in belt weighing system installed at 1028 conveyor under chp-cpp, piparwar area.

Installation, fixing and synchronization of analog belt scale integrator in belt weighing system installed at 1028 conveyor under chp-cpp, piparwar area.

Read more
Shifting of bike stand from siding no. 2 to 8 no pit area under bankola colliery.

Shifting of bike stand from siding &#x0d no. 2 to 8 no pit area under bankola colliery.&#x0d

Read more
2 years operation and maintenance of computerized controlling and monitoring system for 11 nos. tubewells ,11 nos. o.h.t. and 1 no. c.w.r. in newly added area in nagar palika parishad muzaffarnagar under deposit programme distt- muzaffarnagar.

2 years operation and maintenance of computerized controlling and monitoring system for 11 nos. tubewells ,11 nos. o.h.t. and 1 no. c.w.r. in newly added area in nagar palika parishad muzaffarnagar under deposit programme distt- muzaffarnagar.

Read more
Improvement of different roads and drainage system under udaipur municipal council area/ construction of rcc drain from rajarbag uphc to maragang box culvert under umc ward no.17 during the year 2024-25 (length 400.00 m)./sh rcc work, cd work etc (2

Improvement of different roads and drainage system under udaipur municipal council area/ construction of rcc drain from rajarbag uphc to maragang box culvert under umc ward no.17 during the year 2024-25 (length 400.00 m)./sh rcc work, cd work etc (2

Read more
Dismantling and erection of 440v oh line from 630kva transformer of feeder breaker to sampling office/ siding office and 630 kva transformer to drr-2 , mohan nagar pond and supplying power to road wb no-02 under dakra project, n.k area

Dismantling and erection of 440v oh line from 630kva transformer of feeder breaker to sampling office/ siding office and 630 kva transformer to drr-2 , mohan nagar pond and supplying power to road wb no-02 under dakra project, n.k area

Read more
Installation, fixing and synchronization of analog belt scale integrator in belt weighing system installed at 1028 conveyor under chp-cpp, piparwar area.

Installation, fixing and synchronization of analog belt scale integrator in belt weighing system installed at 1028 conveyor under chp-cpp, piparwar area.

Read more
Repairing of 03 no. of operator console installed at control room chp-cpp and ent office under chp-cpp, piparwar area.

Repairing of 03 no. of operator console installed at control room chp-cpp and ent office under chp-cpp, piparwar area.

Read more
Annual testing required for the stamping of 03 no weighbridges (kuya ocp, bastacolla ocp and bnr railway siding weighbridge) under bastacolla area and shifting of 01 time 20 tonne test weights i.e. 20 tonnes test weights from burragarh siding to bast

Annual testing required for the stamping of 03 no weighbridges (kuya ocp, bastacolla ocp and bnr railway siding weighbridge) under bastacolla area and shifting of 01 time 20 tonne test weights i.e. 20 tonnes test weights from burragarh siding to bast

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise