Tender Details

Particulars Details
Title
The Shifting Of Rfid Based Automatic Weighment Complete Setup From Gandhi Nagar Wb To Newly Constructed Road Wb At Cp Siding, Giridih Project.
Description
The Shifting Of Rfid Based Automatic Weighment Complete Setup From Gandhi Nagar Wb To Newly Constructed Road Wb At Cp Siding, Giridih Project
Organisation Coal India Limited (CIL)
Tender Id 2024_CCL_297566_1
Reference
Number
pe(enm)/grd/e-nit/23-24/92
Tender Fee
EMD 600
Tender Value
Place po office grd
Link
View Original Tender Notice

https://coalindiatenders.nic.in

Start Date January 04, 2024 14:30
End Date
Expired 17/01/2024

Expired 886 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Pitc of led bollard light along the newly constructed connecting path from officer mess to vip hut at stc bsf chakur

Pitc of led bollard light along the newly constructed connecting path from officer mess to vip hut at stc bsf chakur

Read more
Construction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road

Construction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road

Read more
Construction of interlocking road and drain from manokamna temple gate to the pond in mohammed ramlila ward no. 7 of nagar panchayat jhalhu, bijnor district. length 80.30 meters.

Construction of interlocking road and drain from manokamna temple gate to the pond in mohammed ramlila ward no. 7 of nagar panchayat jhalhu, bijnor district. length 80.30 meters.&amp#x0d

Read more
Complete repairing/rewinding of 03 numbers of 10hp,550v,3phase,2900rpm submersible pump motors for ensuring smooth water supply to the residential quarters and boiler reservoir from riverside borehole, old 7 no. pit and water reservoir at madhaipur

Complete repairing/rewinding of 03 numbers of 10hp,550v,3phase,2900rpm submersible pump motors for ensuring smooth water supply to the residential quarters and boiler reservoir from riverside borehole, old 7 no. pit and water reservoir at madhaipur

Read more
Shifting and reinstallation of rfid based weighment system from the site of chp wb bs 2 to newly installed 100 tonne wb no.11 (in front of piparwar workshop) under piparwar area.

Shifting and reinstallation of rfid based weighment &#x0d system from the site of chp wb bs 2 to newly &#x0d installed 100 tonne wb no.11 (in front of piparwar &#x0d workshop) under piparwar area.

Read more
Shifting of lt lines from the existing position to the newly constructed utility section in the erstwhile cp bungalow premise

Shifting of lt lines from the existing position to the newly constructed utility section in the erstwhile cp bungalow premise

Read more
Provision of shifting of rfid based weighment system and dismantling and re-erection of 60 feet lattice tower along with the dismantling of cctv, rf radio from kdh road wb no. 04 and re-installing at new location under nk area

Provision of shifting of rfid based weighment system and dismantling and re-erection of 60 feet lattice tower along with the dismantling of cctv, rf radio from kdh road wb no. 04 and re-installing at new location under nk area

Read more
Provision of shifting of rfid based weighment system and dismantling and re-erection of 60 feet lattice tower along with the dismantling of cctv, rf radio from kdh road wb no. 04 and re-installing at new location under nk area

Provision of shifting of rfid based weighment system and dismantling and re-erection of 60 feet lattice tower along with the dismantling of cctv, rf radio from kdh road wb no. 04 and re-installing at new location under nk area

Read more
Administrative approval for the work of fitting of container with proper foundations for facilitating the shifting of wb from bankola siding-i to siding-2

Administrative approval for the work of fitting of container with proper foundations for facilitating the shifting of wb from bankola siding-i to siding-2

Read more
Dismantling, shifting,erection of 3.3 kv ht,440 volt lt oh line at road crossing of newly constructed road for hanuman mandir near enm workshop, 4 no chp, erection of street light poles along with newly constructed road from 4 no chp to base workshop

Dismantling, shifting, erection of 3.3 kv ht,440 volt lt oh line at road crossing of newly constructed road for hanuman mandir near enm workshop, 4 no chp,erection of street light poles along with newly constructed road from 4 no chp to base workshop

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise