Tender Details
Particulars | Details |
---|---|
Title |
Repairing/Maintenance Of Base Plate, Changing Of Load Cell And Covering Of Load Cell Wire Through Conduit Pipe Of Various Weigh Bridge Like W/B No 01, 02, 10, Bs I And Bs Ii Under Chp Cpp, Piparwar.
|
Description |
Repairing/Maintenance Of Base Plate, Changing Of Load Cell And Covering Of Load Cell Wire Through Conduit Pipe Of Various Weigh Bridge Like W/B No 01, 02, 10, Bs I And Bs Ii Under Chp Cpp, Piparwar.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_329836_1 |
Reference Number |
PE/Elec/CHP/PPR/e-NIT/24-25/39 |
Tender Fee | 0 |
EMD | 3100 |
Tender Value | |
Place | OFFICE OF PO CHP-CPP, Piparwar Area, CCL |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341879 |
Start Date | February 21, 2025 22:30 |
End Date |
03/03/2025 ( Expired 49 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Urgent repairing of approach road of bs 01 weighbridge at bachra siding under chp cpp, piparwar area
Urgent repairing of approach road of bs 01 weighbridge at bachra siding under chp cpp, piparwar area
Read moreRepair of old extension rcc boundary wall along, tandwa, khalari main road near billari village and weigh bridge no.01, 02 under chp cpp piparwar area.
Repair of old extension rcc boundary wall along, tandwa, khalari main road near billari village and weigh bridge no.01, 02 under chp cpp piparwar area.
Read moreRepairing works of damaged platform of 100 mt electronic road weigh bridge no -11 make tycoon and changing of 2 no. load cell cap. 30 te. under chp-cpp, piparwar.
Repairing works of damaged platform of 100 mt electronic road weigh bridge no -11 make tycoon and changing of 2 no. load cell cap. 30 te. under chp-cpp, piparwar.
Read moreRepairing/maintenance of base plate, changing of load cell and covering of load cell wire through conduit pipe of various weigh bridge like w/b no -01, 02, 10, bs-i and bs-ii under chp-cpp, piparwar.
Repairing/maintenance of base plate, changing of load cell and covering of load cell wire through conduit pipe of various weigh bridge like w/b no -01, 02, 10, bs-i and bs-ii under chp-cpp, piparwar.
Read moreProviding and fixing of digital load cell, digitizer and junction box for verification and re-stamping of electronic road weigh bridge no. 01 and stamping of road weigh bridge no. 02 installed at rohini ocp, nk area
Providing and fixing of digital load cell, digitizer and junction box for verification and re-stamping of electronic road weigh bridge no. 01 and stamping of road weigh bridge no. 02 installed at rohini ocp, nk area
Read moreClubbed work (1) repairing, spare changing, servicing of complete assembly of hydraulic huck bolting machine 940-220 of chp and (2) gear box side drive shaft 01 no. damaged bearing replacement of conveyor 1020 under chp-cpp, piparwar.
Clubbed work (1) repairing, spare changing, servicing of complete assembly of hydraulic huck bolting machine 940-220 of chp and (2) gear box side drive shaft 01 no. damaged bearing replacement of conveyor 1020 under chp-cpp, piparwar.
Read moreRepairing /maintenance and fabrication of platform structure for weigh bridge no.01, 10 and bs-ii bachra siding under chp-cpp, ppr.
Repairing /maintenance and fabrication of platform structure for weigh bridge no.01, 10 and bs-ii bachra siding under chp-cpp, ppr.
Read more21/se/c-ii/r b/kmda/ w-28 (part-vii) of 2024-2025 date-02/01/2025
Minor repairing, upkeeping and maintenance of carriageway of sonarpur rob, kamalgazi flyover and service road under kamalgazi flyover under south divn., r b sector, kmda for a period from dated 19.01.2025 to 31.12.2025 i.e ( 347) days.
Read more(a). repairing/ replacement of digtal make 50te capacity, electronic road w/b installed at zero point of gvp phase-ii ocp, (b). supply and installation of g.i flexible conduit pipe wiring from load cell to junction box in 02 nos., 50te capacity elect
(a). repairing/ replacement of digtal make 50te capacity, electronic road w/b installed at zero point of gvp phase-ii ocp, (b). supply and installation of g.i flexible conduit pipe wiring from load cell to junction box in 02 nos., 50te capacity elect
Read moreRepairing /maintenance and fabrication of platform structure for weigh bridge no. 02 and bs-i bachra siding under chp-cpp/ppr.
Repairing /maintenance and fabrication of platform structure for weigh bridge no. 02 and bs-i bachra siding under chp-cpp/ppr.
Read moreof your Industry type