Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Provn Of Rr Masonry Retaining Wall And Allied Infra (Under Para 35) Along The Road At Taramount Under Ge (South) Udhampur
|
| Description |
Provn Of Rr Masonry Retaining Wall And Allied Infra (Under Para 35) Along The Road At Taramount Under Ge (South) Udhampur
|
| Organisation | E-IN-C BRANCH - MILITARY ENGINEER SERVICES | Central Govt. Ministry/Department |
| Tender Id | 2025_MES_729520_1 |
|
Reference Number |
CWE/U(N)-51/2025-26 |
| Tender Fee | 500 |
| EMD | 97000 |
| Tender Value | - |
| Place | UDHAMPUR |
| Link |
View Original Tender Notice
https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=816700 |
| Start Date | September 11, 2025 14:30 |
| End Date |
Expired
17/09/2025
Expired 394 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Provn and repair of retaining wall and related drainage works at bhimber gali garrision under para 35 under ge 881 ews
Provn and repair of retaining wall and related drainage works at bhimber gali garrision under para 35 under ge 881 ews
Read moreSpl repair to bldg no ow-05 and provn of stone masonry retaining wall in 39 mdsr under palampur mil stn
Spl repair to bldg no ow-05 and provn of stone masonry retaining wall in 39 mdsr under palampur mil stn
Read moreProvn of parking shed for 10 type a specialist vehicles in ins sardar patel (para 35 sanction) under ge (navy) porbandar
Provn of parking shed for 10 type a specialist vehicles in ins sardar patel (para 35 sanction) under ge (navy) porbandar
Read moreDevelopment and construction of cover drain and mtc of the road adjacent to joydurga para starting from south ramnagar s.b school and its axillary road network under amc ward no 35
Patch soling, wbm, carpeting, potholes repair, paver block, toe wall, drain mtc. and other allied works etc.
Read moreCa no. cwe/hills/rkt/105 of 2026-2027 provn of retaining walls in front of bldg no p-214, p-102 (mt) and p 63 (unit magazine) at chaubattia mil stn under para 36 (urgent works) of dwp 2020
Ca no. cwe/hills/rkt/105 of 2026-2027 provn of retaining walls in front of bldg no p-214, p-102 (mt) and p 63 (unit magazine) at chaubattia mil stn under para 36 (urgent works) of dwp 2020
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read morePara 35 provn of certain buildings for office of ge af udhampur
Para 35 provn of certain buildings for office of ge af udhampur
Read moreProvn of infra requirement for rndlc at signal centre (ncsr) under ge (south) udhampur
Provn of infra requirement for rndlc at signal centre (ncsr) under ge (south) udhampur
Read moreConstruction of rr masonry retaining wall at the
Construction of rr masonry retaining wall at the
 north side of lhc at iiser thiruvananthapuram
Read moreof your Industry type