Tender Details

Particulars Details
Title
Construction Of Flood Protection Bunds At Kiyar Using Crate Wire Bunds With Foundation Of 3ft Depth Proper Anchoring Under Mitigation Plan Of Khanp 2023 24
Description
Construction Of Flood Protection Bunds At Kiyar Using Crate Wire Bunds With Foundation Of 3ft Depth Proper Anchoring Under Mitigation Plan Of Khanp 2023 24
Organisation Government of Jammu and Kashmir
Tender Id 2023_FD_217284_2
Reference
Number
NIT 28 OF 2023-24 FLOOD PROTECTION KIYAR
Tender Fee 300
EMD 11976
Tender Value -
Place Jammu
Link
View Original Tender Notice

https://jktenders.gov.in

Start Date July 13, 2023 19:30
End Date
Expired 22/07/2023

Expired 1180 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Construction of flood protection bunds at kiyar using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Construction of flood protection bunds at kiyar using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Read more
Construction of flood protection bunds at kiyar using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Construction of flood protection bunds at kiyar using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Read more
Construction of flood protection bunds at kiyar using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Construction of flood protection bunds at kiyar using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Read more
Construction of flood protection bunds at renai using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Construction of flood protection bunds at renai using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Read more
Construction of flood protection bunds at nanth using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Construction of flood protection bunds at nanth using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Read more
Construction of flood protection bunds at kibar using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Construction of flood protection bunds at kibar using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Read more
Construction of flood protection bunds at renai using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Construction of flood protection bunds at renai using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Read more
Construction of flood protection bunds at nanth using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Construction of flood protection bunds at nanth using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Read more
Construction of flood protection bunds at renai using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Construction of flood protection bunds at renai using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise