Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Flood Protection Bunds At Renai Using Crate Wire Bunds With Foundation Of 3ft Depth Proper Anchoring Under Mitigation Plan Of Khanp 2023 24
|
| Description |
Construction Of Flood Protection Bunds At Renai Using Crate Wire Bunds With Foundation Of 3ft Depth Proper Anchoring Under Mitigation Plan Of Khanp 2023 24
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_FD_217311_1 |
|
Reference Number |
NIT 30 OF 2023-24 FLOOD PROTECTION BUNDS RENAI |
| Tender Fee | 300 |
| EMD | 11976 |
| Tender Value | - |
| Place | Wildlife Warden Chenab Division Kishtwar. |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | June 17, 2023 22:05 |
| End Date |
Expired
01/07/2023
Expired 1201 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreConstruction of flood protection bunds at renai using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Construction of flood protection bunds at renai using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Read moreConstruction of flood protection bunds at renai using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Construction of flood protection bunds at renai using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Read moreConstruction of flood protection bunds at renai using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Construction of flood protection bunds at renai using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Read moreConstruction of flood protection bunds at nanth using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Construction of flood protection bunds at nanth using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Read moreConstruction of flood protection bunds at kibar using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Construction of flood protection bunds at kibar using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Read moreConstruction of flood protection bunds at kiyar using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Construction of flood protection bunds at kiyar using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Read moreConstruction of flood protection bunds at nanth using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Construction of flood protection bunds at nanth using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Read moreConstruction of flood protection bunds at kiyar using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Construction of flood protection bunds at kiyar using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Read moreConstruction of flood protection bunds at kiyar using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Construction of flood protection bunds at kiyar using crate wire bunds with foundation of 3ft depth proper anchoring under mitigation plan of khanp 2023 24
Read moreof your Industry type