Tender Details

Particulars Details
Title
Wetting The Surface Of Ash Dyke By Engaging Hired Water Tanker With Pumping Arrangements For Three Months From The Date Of Commencement Of Work At Ttps
Description
Wetting The Surface Of Ash Dyke By Engaging Hired Water&Amp#X0d Tanker With Pumping Arrangements For Three Months From The&Amp#X0d Date Of Commencement Of Work At Ttps
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_588916_1
Reference
Number
CE SE C TTPS 201 2025 26
Tender Fee 0
EMD 5300
Tender Value -
Place Tuticorin Thermal Power Station
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=703527

Start Date August 04, 2025 23:30
End Date
Expired 18/08/2025

Expired 384 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Engaging 1 no. hired poclain for formation of ash bund for wetting the ash dyke surface at ttps

Engaging 1 no. hired poclain for formation of ash bund for&amp#x0d wetting the ash dyke surface at ttps

Read more
Wetting the road surface from eastern side ramp of ash dyke to nctps road for dust suppression by sprinkling water for a period of four months from the date of commencement of work

Wetting the road surface from eastern side ramp of ash dyke to nctps road for dust suppression by sprinkling water for a period of four months from the date of commencement of work

Read more
Watering to the tree saplings along the southern side bund of ash dyke and secondary pond area at ash dyke and maintenance for a period of nine months from the date of commencement

Watering to the tree saplings along the southern side bund of ash dyke and secondary pond area at ash dyke and maintenance for a period of nine months from the date of commencement

Read more
Watering to the tree saplings along the southern side bund of ash dyke and secondary pond area at ash dyke and maintenance for a period of nine months from the date of commencement

Watering to the tree saplings along the southern side bund of ash dyke and secondary pond area at ash dyke and maintenance for a period of nine months from the date of commencement

Read more
Protection arrangements by strengthening bottom layer the cross bund spillway using rough stone in ash dyke area at ttps

Protection arrangements by strengthening bottom layer the cross bund spillway using rough stone in ash dyke area at ttps

Read more
Protection arrangements by strengthening ii layer the cross bund spillway using rough stone in ash dyke area at ttps

Protection arrangements by strengthening ii layer the cross bund spillway using rough stone in ash dyke area at ttps

Read more
Protection arrangements by strengthening and raising the existing bund towards a1 dyke from ch 0m to ch 200m in ash dyke area at ttps

Protection arrangements by strengthening and raising the&amp#x0d existing bund towards a1 dyke from ch 0m to ch 200m in ash&amp#x0d dyke area at ttps

Read more
Protection arrangements by strengthening top layer and raising the cross bund spillway using rough stone in ash dyke area at ttps

Protection arrangements by strengthening top layer and raising the cross bund spillway using rough stone in ash dyke area at ttps

Read more
Protection arrangements by strengthening and raising the existing bund towards a1 dyke from east side culvert for a length of 200 m in ash dyke area at ttps

Protection arrangements by strengthening and raising the&amp#x0d existing bund towards a1 dyke from east side culvert for a&amp#x0d length of 200 m in ash dyke area at ttps

Read more
Protection arrangements in the eroded portion of east side primary pond using rejected coal stone debris and ash with mill reject in ash dyke area at ttps

Protection arrangements in the eroded portion of east side primary pond using rejected coal stone debris and ash with mill reject in ash dyke area at ttps

Read more
Click Here to Download Dockets
of your Industry type