Tender Details

Particulars Details
Title
Improvement Of 3 Rural Roads Of Length 5.250 Km In Kollidam Block And 6 Roads Of Length 8.335 Km In Sirkali Block Of Mayiladuthurai District Under Sasci (Roads) 2025 2026
Description
Improvement Of 3 Rural Roads Of Length 5.250 Km In Kollidam Block And 6 Roads Of Length 8.335 Km In Sirkali Block Of Mayiladuthurai District Under Sasci (Roads) 2025 2026
Organisation Rural Development and Panchayat Raj Department | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 6 Lakh
Tender Value
Place Kollidam,Sirkali
Link

AAAAAAAAAA

Login to view
Start Date June 16, 2025 21:30
End Date

25/06/2025 ( 8 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i

Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i

Read more
Consultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km

Consultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km

Read more
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Read more
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Read more
Construction of rcc draintotal 8.06 km of nh-512 nh division vii

Construction of rcc drain for a total 8.06 km of nh-512 under nh div. no. vii, p.w. (roads)directorate in the district of dakshin dinajpur west bengal on epc mode job no.512/wb/2025-26/569

Read more
Niet no. - 12 of the fy 2025-2026 of the ee/bqa, phe dte.(sl.no-15)

Supply and installation of spare parts and supply of raw materials for dejuri bottling plant of barjora block, under bankura sadar sub- division of bankura division, p.h.e. dte.

Read more
Nit03/se/2025-26 lot-01

Rehabilitation and improvement of lower khajuri weir in mirzapur district of uttar pradesh under drip-ii

Read more
Improvement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector

Improvement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise