Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sr To Ei To Old Paediatric Building To Be Functioned As Medicine First Second And Third Floor Of Mkcg Mc And H Berhampur.
|
| Description |
Sr To Ei To Old Paediatric Building To Be Functioned As Medicine First Second And Third Floor Of Mkcg Mc And H Berhampur.
|
| Organisation | Government of Odisha |
| Tender Id | 2023_EICCL_91135_1 |
|
Reference Number |
SE (RandB) Divn No.I-BAM-17/2023-24 |
| Tender Fee | 4000 |
| EMD | 8500 |
| Tender Value | - |
| Place | Superintending Engineer Ganjam RandB Division No.I |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in |
| Start Date | July 24, 2023 18:40 |
| End Date |
Expired
29/07/2023
Expired 1174 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai
Tender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai
Read moreSupply, installation and commissioning of gas generator,post warranty first year camc,post warranty second year camc,post warranty third year camc
Supply, installation and commissioning of gas generator,post warranty first year camc,post warranty second year camc,post warranty third year camc
Read moreKone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Kone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Read moreBoiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Read moreSupply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.
Supply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.
Read moreSterile ice slush making machine,single user container,cmc first year,cmc second year,cmc third year,cmc forth year,cmc fifth year,cmc sixth year,cmc seventh year,cmc eighth year
Sterile ice slush making machine,single user container,cmc first year,cmc second year,cmc third year,cmc forth year,cmc fifth year,cmc sixth year,cmc seventh year,cmc eighth year
Read moreTk elevator 8 passenger lift 544kg in library building no of floors 6 for the first year,tk elevator 8 passenger lift 544kg in aerospace building no of floors 4 for the first year,tk elevator 8 passenger lift 544kg in science building no of floors 3 for the first year,tk elevator dumb waiter 250kg in mess-02 building no of floors 3 for the first year,tk elevator 8 passenger lift 544kg in library building no of floors 6 for the second year,tk elevator 8 passenger lift 544kg in aerospace building no of floors 4 for the second year,tk elevator 8 passenger lift 544kg in science building no of floors 3 for the second year,tk elevator dumb waiter 250kg in mess 02 building no of floors 3 for the second year,tk elevator 8 passenger lift 544kg in library building no of floors 6 for the third year,tk elevator 8 passenger lift 544kg in aerospace building no of floors 4 for the third year,tk elevator 8 passenger lift 544kg in science building no of floors 3 for the third year,tk elevator dumb waiter 250kg in mess 02 buil
Tk elevator 8 passenger lift 544kg in library building no of floors 6 for the first year,tk elevator 8 passenger lift 544kg in aerospace building no of floors 4 for the first year,tk elevator 8 passenger lift 544kg in science building no of floors 3 for the first year,tk elevator dumb waiter 250kg in mess-02 building no of floors 3 for the first year,tk elevator 8 passenger lift 544kg in library building no of floors 6 for the second year,tk elevator 8 passenger lift 544kg in aerospace building no of floors 4 for the second year,tk elevator 8 passenger lift 544kg in science building no of floors 3 for the second year,tk elevator dumb waiter 250kg in mess 02 building no of floors 3 for the second year,tk elevator 8 passenger lift 544kg in library building no of floors 6 for the third year,tk elevator 8 passenger lift 544kg in aerospace building no of floors 4 for the third year,tk elevator 8 passenger lift 544kg in science building no of floors 3 for the third year,tk elevator dumb waiter 250kg in mess 02 buil
Read moreN.c putty grey with hardner - 01 kg pack [n.c putty grey with hardner - 01 kg pack each . make: cellocoat (or) shenlac (or) esdee only. note: 1. one sample to be got approved before effecting bulk supply. 2. supply should be staggered in two spells. (i.e first spell to be supplied within 1 month from the date of issue of purchase order. second spell to be supplied after 6 month from ist spell supply. each spell qualty:100kg)]
N.c putty grey with hardner - 01 kg pack [n.c putty grey with hardner - 01 kg pack each . make: cellocoat (or) shenlac (or) esdee only. note: 1. one sample to be got approved before effecting bulk supply. 2. supply should be staggered in two spells. (i.e first spell to be supplied within 1 month from the date of issue of purchase order. second spell to be supplied after 6 month from ist spell supply. each spell qualty:100kg)]
Read moreHigh end surgical drill system with atachement,foot control,electric high speed motor,attachment for cranial surgery long straight,attachment for cranial surgery long angled,attachment for cranial surgery medium straight,attachment for cranial surgery short straight,dura guard rotating foot adult,dura guard rotating foot paediatric,duraguard rotating foot for laminectomy adult,universal drill perforation chuck,universal jacob chuck with key,attachment variaable straight nine cm,instruments tray,suitable trolley to be provided with each drill same manufacture,bone cutter drill bit for craniotomy adult,bone cutter drill bit for craniotomy paed,fast cutting match head burr long 3 mm,diamond burr match head long 3mm,fast cutting match head burr short 5mm or 6mm,cmc first year,cmc second year,cmc third year,cmc fourth year,cmc fifth year,cmc six year,cmc seven year,cmc eight year
High end surgical drill system with atachement,foot control,electric high speed motor,attachment for cranial surgery long straight,attachment for cranial surgery long angled,attachment for cranial surgery medium straight,attachment for cranial surgery short straight,dura guard rotating foot adult,dura guard rotating foot paediatric,duraguard rotating foot for laminectomy adult,universal drill perforation chuck,universal jacob chuck with key,attachment variaable straight nine cm,instruments tray,suitable trolley to be provided with each drill same manufacture,bone cutter drill bit for craniotomy adult,bone cutter drill bit for craniotomy paed,fast cutting match head burr long 3 mm,diamond burr match head long 3mm,fast cutting match head burr short 5mm or 6mm,cmc first year,cmc second year,cmc third year,cmc fourth year,cmc fifth year,cmc six year,cmc seven year,cmc eight year
Read moreSupply of group 01,site work for group 01,transportation charges for group 01,supply of mandatory spares for group 01,training charges for group 01,pwcamc charges for first 1 year for group 01,pwcamc charges for second 2 year for group 01,pwcamc charges for third 3 year for group 01,pwcamc charges for fourth 4 year for group 01,pwcamc charges for fifth 5 year for group 01,pre commissioning charges for group 01
Supply of group 01,site work for group 01,transportation charges for group 01,supply of mandatory spares for group 01,training charges for group 01,pwcamc charges for first 1 year for group 01,pwcamc charges for second 2 year for group 01,pwcamc charges for third 3 year for group 01,pwcamc charges for fourth 4 year for group 01,pwcamc charges for fifth 5 year for group 01,pre commissioning charges for group 01
Read moreof your Industry type