Tender Details

Particulars Details
Title
Supply, Installation, Testing And Commissioning Of Air Conditioning System And Fire Fighting Works For Proposed Pdic Building Second, Third And Fourth Floor (A Block And D Block), Be Bg.
Description
Supply, Installation, Testing And Commissioning Of Air Conditioning System And Fire Fighting Works For Proposed Pdic Building Second, Third And Fourth Floor (A Block And D Block), Be Bg.
Organisation Bharat Electronics Limited | Bangalore Unit - BEL | ES - BEL | Contracts-ES - BEL
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value 6.85 Crore
Place
Link Login to view
Start Date October 01, 2026 18:00
End Date
Open 23/10/2026

5 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Corrigenda & Amendments (1)

The issuing authority has issued modifications/date extensions for this tender.

#1 Date

Corrigendum-1

Similar Tenders
Tender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai

Tender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai

Read more
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification

Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification

Read more
9136431252 - mwdxrf chlorine analyzer astm d7536,serv - first year amc - half-yearly charges,serv - second year amc - half - yearly charges,serv - third year amc - half-yearly charges,serv - fourth year amc - half-yearly charges,serv - fifth year amc - half-yearly charges

9136431252 - mwdxrf chlorine analyzer astm d7536,serv - first year amc - half-yearly charges,serv - second year amc - half - yearly charges,serv - third year amc - half-yearly charges,serv - fourth year amc - half-yearly charges,serv - fifth year amc - half-yearly charges

Read more
Providing installation and commissioning of high wall and floor mounted vertical split type air conditioning system in the nels national emergency life support skill centre at second floor of blood bank at agmc gbp hospital complex agartala tripura

Providing installation and commissioning of high wall and floor mounted vertical split type air conditioning system in the nels national emergency life support skill centre at second floor of blood bank at agmc gbp hospital complex agartala tripura

Read more
Providing internal and external electrification, ups, laminar flow and split ac arrangements to the additional building for ot with post operative ward (second and third floor) in government hospital at cheranmahadevi in tirunelveli district.

Providing internal and external electrification, ups, laminar flow and split ac arrangements to the additional building for ot with post operative ward (second and third floor) in government hospital at cheranmahadevi in tirunelveli district.

Read more
Multi energy x-ray baggage scanner,,3, kva, on line ups,1.5 tr inverter split ac,instal. and comm. of xbis and associated accessories,camc for first year,camc for second year,camc for third year,camc for fourth year,camc for fifth year

Multi energy x-ray baggage scanner,,3, kva, on line ups,1.5 tr inverter split ac,instal. and comm. of xbis and associated accessories,camc for first year,camc for second year,camc for third year,camc for fourth year,camc for fifth year

Read more
Supply of group 01,site work for group 01,transportation charges for group 01,supply of mandatory spares for group 01,training charges for group 01,pwcamc charges for first 1 year for group 01,pwcamc charges for second 2 year for group 01,pwcamc charges for third 3 year for group 01,pwcamc charges for fourth 4 year for group 01,pwcamc charges for fifth 5 year for group 01,pre commissioning charges for group 01

Supply of group 01,site work for group 01,transportation charges for group 01,supply of mandatory spares for group 01,training charges for group 01,pwcamc charges for first 1 year for group 01,pwcamc charges for second 2 year for group 01,pwcamc charges for third 3 year for group 01,pwcamc charges for fourth 4 year for group 01,pwcamc charges for fifth 5 year for group 01,pre commissioning charges for group 01

Read more
Design and supply of mounting of module structures, pv module for 198 kwp solar plant,site development, design, engineering, construction, erection, testing and commissioning of the 198 kwp solar plant,price for o and m cum amc for first year,price for o and m cum amc for second year,price for o and m cum amc for third year,price for o and m cum amc for fourth year,price for o and m cum amc for fifth year

Design and supply of mounting of module structures, pv module for 198 kwp solar plant,site development, design, engineering, construction, erection, testing and commissioning of the 198 kwp solar plant,price for o and m cum amc for first year,price for o and m cum amc for second year,price for o and m cum amc for third year,price for o and m cum amc for fourth year,price for o and m cum amc for fifth year

Read more
High end surgical drill system with atachement,foot control,electric high speed motor,attachment for cranial surgery long straight,attachment for cranial surgery long angled,attachment for cranial surgery medium straight,attachment for cranial surgery short straight,dura guard rotating foot adult,dura guard rotating foot paediatric,duraguard rotating foot for laminectomy adult,universal drill perforation chuck,universal jacob chuck with key,attachment variaable straight nine cm,instruments tray,suitable trolley to be provided with each drill same manufacture,bone cutter drill bit for craniotomy adult,bone cutter drill bit for craniotomy paed,fast cutting match head burr long 3 mm,diamond burr match head long 3mm,fast cutting match head burr short 5mm or 6mm,cmc first year,cmc second year,cmc third year,cmc fourth year,cmc fifth year,cmc six year,cmc seven year,cmc eight year

High end surgical drill system with atachement,foot control,electric high speed motor,attachment for cranial surgery long straight,attachment for cranial surgery long angled,attachment for cranial surgery medium straight,attachment for cranial surgery short straight,dura guard rotating foot adult,dura guard rotating foot paediatric,duraguard rotating foot for laminectomy adult,universal drill perforation chuck,universal jacob chuck with key,attachment variaable straight nine cm,instruments tray,suitable trolley to be provided with each drill same manufacture,bone cutter drill bit for craniotomy adult,bone cutter drill bit for craniotomy paed,fast cutting match head burr long 3 mm,diamond burr match head long 3mm,fast cutting match head burr short 5mm or 6mm,cmc first year,cmc second year,cmc third year,cmc fourth year,cmc fifth year,cmc six year,cmc seven year,cmc eight year

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise