Tender Details

About Tender

πŸš‚ Procurement Notice: Telecom Cable Replacement Project πŸ”§πŸŒ The Ministry Of Railways, Specifically The Central Government Ministry/Department, Has Issued A Procurement Notice For The Replacement Of Outlived Telecom Cables In Several Key Sections Of The Ambala Division. πŸ—ΊοΈ πŸ“… Submission Deadline: June 3, 2024, 3:00 Pm Interested Bidders Are Required To Submit An Earnest Money Deposit (Emd) Of Inr 246,600. πŸ’° Detailed Tender Documents Must Be Consulted For Comprehensive Project Specifications And Requirements. πŸ“‘ Keywords: Telecom Cable, Replacement, Ministry Of Railways, Ambala Division, Government Procurement, Tender, Emd, Central Govt. Ministry/Department
Particulars Details
Title
Replacement Of Outlived Telecom Cable In Barara Mustafabad, Barara Kesri, Hindon Cabin Khanalampura Yard Saharanpur And Ambala Mohri Section Of Ambala Division
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 74615343
Reference
Number
OT-06-2024-25
Tender Fee 0
EMD 2.47 Lakh
Tender Value
Place New Delhi
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/062024/74615343/viewNitPdf_4537064.pdf

Start Date May 10, 2024 22:33
End Date
Expired 03/06/2024

Expired 756 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Maintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).

Maintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).

Read more
Replacement of old control panel wornout, gi pipe, lowering pipe and jointing of submersible cable 16 sqmm finolex make at twell no.2 in sector 10 panchkula

Replacement of old control panel wornout, gi pipe, lowering pipe and jointing of submersible cable 16 sqmm finolex make at twell no.2 in sector 10 panchkula

Read more
Replacement of existing lt oh conductor to ug lt xlpe cable, lt panel feeder pillar with connected items in bldg. no p-7 to p-11, p-18 to p-21, p-59, p-60, p-61 to p-72, p-222, p-447 and stp md accn at jak li rc srinagar under ge 970 ews

Replacement of existing lt oh conductor to ug lt xlpe cable, lt panel feeder pillar with connected items in bldg. &#x0d no p-7 to p-11, p-18 to p-21, p-59, p-60, p-61 to p-72, p-222, p-447 and &#x0d stp md accn at jak li rc srinagar under ge 970 ews

Read more
Replacement of cable tray and cable at hindon barrage, ghaziabad

Replacement of cable tray and cable at hindon barrage, ghaziabad

Read more
Supply of aggregate of rob in lieu of l-xing no. 84 ac (phase-ii) at km. 177/13-15 on meerut-saharanpur rail section on khanalampura yard to dm awas in distt. saharanpur

Supply of aggregate of rob in lieu of l-xing no. 84 ac (phase-ii) at km. 177/13-15 on meerut-saharanpur rail section on khanalampura yard to dm awas in distt. saharanpur

Read more
Const. of i/l tiles in open yard of sehkari bank at village foxa, block barara (ambala)

Const. of i/l tiles in open yard of sehkari bank at village foxa, block barara (ambala)

Read more
Construction of 2 lane rob. in lieu of at lxing 4c at km. 05h-06h on tapri hindon cabin section near tapri junction railway station in distt. saharanpur

Construction of 2 lane rob. in lieu of at lxing 4c at km. 05h-06h on tapri hindon cabin section near tapri junction railway station in distt. saharanpur

Read more
Construction of re wall (dm awas side) at rob in lieu of l-xing no. 84 ac (phase-ii) at km. 177/13-15 on meerut-saharanpur rail section on khanalampura yard to dm awas in distt. saharanpur.

Construction of re wall (dm awas side) at rob in lieu of l-xing no. 84 ac (phase-ii) at km. 177/13-15 on meerut-saharanpur rail section on khanalampura yard to dm awas in distt. saharanpur.

Read more
Bituminous work in service road of rob of l-xing no. 84 ac (phase-ii) at km. 177/13-15 on meerut-saharanpur rail section on khanalampura yard to dm awas and approach road of bridge over river dhamola near vishwakarma chowk in distt. saharanpur

Bituminous work in service road of rob of l-xing no. 84 ac (phase-ii) at km. 177/13-15 on meerut-saharanpur rail section on khanalampura yard to dm awas and approach road of bridge over river dhamola near vishwakarma chowk in distt. saharanpur

Read more
Supply of signalling/telecom cable (rdso approved signalling/telecom cable) for ei based automatic signalling in dhaulpur to gwalior section of jhansi division of north central railway

Supply of signalling/telecom cable (rdso approved signalling/telecom cable) for ei based automatic signalling in dhaulpur to gwalior section of jhansi division of north central railway

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise