Tender Details

Particulars Details
Title
Renovation Works In Front Of Circle And Division Office Complex At Kamaleswaram
Description
General Modernisation, Research And Development Of Hed Renovation Works In Front Of Circle And Division Office Complex At Kamaleswaram General Civil Work
Organisation Harbour Engineering Department | State Govt. and UT
Tender Id 2025_HED_791032_1
Reference
Number
HED/CEHED/TR/689/2025_5_1_1/1
Tender Fee 2760
EMD 38909
Tender Value -
Place Kamaleswaram
Link
View Original Tender Notice

https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1304071

Start Date August 25, 2025 23:30
End Date
Expired 08/09/2025

Expired 382 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.

Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.

Read more
Construction of commercial complex building at rapcms ltd yard in mandya

Construction of commercial complex building at rapcms ltd yard in mandya

Read more
Erection of 4th 80mva ptr at 132kv ss erragadda substation in omc metro central circle/metro-zone-i

Erection of 4th 80mva ptr at 132kv ss erragadda substation in omc metro central circle/metro-zone-i

Read more
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.

Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.

Read more
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.

Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.

Read more
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs raidurg, serilingampally (m) in ranga reddy district

Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs raidurg, serilingampally (m) in ranga reddy district

Read more
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs miyapur, serilingampally (m) in ranga reddy district

Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs miyapur, serilingampally (m) in ranga reddy district

Read more
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs darga (um), serilingampally (m) in ranga reddy district

Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs darga (um), serilingampally (m) in ranga reddy district

Read more
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise