Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renewal With General Repair Of Nh 2/19 Patari Durwasha Rishi Ashram Nigohi Baraur Gurgao Road (Odr) In Km. 14, 16 To 18
|
| Description |
Renewal With General Repair Of Nh 2/19 Patari Durwasha Rishi Ashram Nigohi Baraur Gurgao Road (Odr) In Km. 14, 16 To 18
|
| Organisation | Cheif Engineer Kanpur Zone PWD Kanpur | State Govt. and UT |
| Tender Id | 2025_CEKNP_992477_2 |
|
Reference Number |
7593C/131C-KV/2024 Dt. 30.12.2024 |
| Tender Fee | 3316 |
| EMD | 3.66 Lakh |
| Tender Value | |
| Place | Kanpur Dehat |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1754158 |
| Start Date | January 13, 2025 14:30 |
| End Date |
Expired
22/01/2025
Expired 529 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreStone pitching and protection work on bridge over sengur river pul at km. 8 of nh-19 patari durwasha rishi ashram nigohi baraur gurgao road
Stone pitching and protection work on bridge over sengur river pul at km. 8 of nh-19 patari durwasha rishi ashram nigohi baraur gurgao road
Read moreWidening and strengthening of nh-2/19 patari durwasa rishi ashram nigohi baraur gurgaon road (o.d.r.) km. 5 to 12(100) (length 7.100 km.) in distt. kanpur dehat
Widening and strengthening of nh-2/19 patari durwasa rishi ashram nigohi baraur gurgaon road (o.d.r.) km. 5 to 12(100) (length 7.100 km.) in distt. kanpur dehat
Read moreWidening and strengthening of nh-2/19 patari durwasa rishi ashram nigohi baraur gurgaon road (o.d.r.) km. 15 to 19(100) (length 4.100 km.) in distt. kanpur dehat (including 05 years maintenance cost).
Widening and strengthening of nh-2/19 patari durwasa rishi ashram nigohi baraur gurgaon road (o.d.r.) km. 15 to 19(100) (length 4.100 km.) in distt. kanpur dehat (including 05 years maintenance cost).
Read moreWidening and strengthening of nh-2/19 patari durwasa rishi ashram nigohi baraur gurgaon road (o.d.r.) km. 5 to 12(100) (length 7.100 km.) (including 05 years maintenance cost)in distt. kanpur dehat under constituency bhoganipur
Widening and strengthening of nh-2/19 patari durwasa rishi ashram nigohi baraur gurgaon road (o.d.r.) km. 5 to 12(100) (length 7.100 km.) (including 05 years maintenance cost)in distt. kanpur dehat under constituency bhoganipur
Read moreSpecial repair of baraur nigohi to kesi road in km. 1 and 2(500)
Special repair of baraur nigohi to kesi road in km. 1 and 2(500)
Read moreGeneral repair with renewal of guraicha rampur mathura(odr) in km 1(200) to 14
General repair with renewal of guraicha rampur mathura(odr) in km 1(200) to 14
Read moreof your Industry type