Tender Details

Particulars Details
Title
Nhidcl/Ar.Pr./Fh/Hunli Hayul (Pkg Iii)/233231
Description
Construction Of Intermediate Lane With Hard Shoulder Of Hunli To Hayuliang Package Iii From Design Km 60.000 To Km 121.500 Design Length 61.500 Km, Greenfield Section Of Frontier Highway Nh913 In The State Of Arunachal Pradesh On Epc Mode
Organisation National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department
Tender Id 2024_NHIDC_788765_1
Reference
Number
NHIDCL/Ar.Pr./FH/Hunli- Hayul (PKG-III)/233231
Tender Fee 1.18 Lakh
EMD 9.06 Crore
Tender Value
Place Anjaw
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=829077
Start Date February 13, 2024 14:30
End Date

20/02/2024 ( Expired 474 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project

Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project, baramulla district of ut of j and k, india

Read more
Package iii civil works of water conductor system and power house complex of tato ii hydro electric project

Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep

Read more
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)

Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more

Balance work of rehabilitation and up-gradation of section from km 206.00 to km 239.445 (nimbutala to austin creek) of nh-04 in a n islands on epc basis (pkg-iv) at the risk and cost of existing epc contractor, on percentage rate basis in fy 25-2

Read more
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Read more
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Read more
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Read more
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.

Read more

Widening and up-gradation of existing carriageway into 2-lane with ps configuration from reshi to rhenock from ch. 96.254 to ch. 101.554 along&#x0d nh-717a in the state of sikkim on epc mode 2nd call

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise