Tender Details
About Tender
🏗️ Invitation For Bids: Construction Of Nh 63 Armoor Jagtiyal Mancherial Section 🛣️ The National Highways Authority Of India (Nhai), As A Public Sector Undertaking, Invites Bids From Reputable Construction Firms For The Development Of A 4 Lane Highway On The Armoor Jagtiyal Mancherial Section Of Nh 63 In Telangana. 🚧 📅 Bid Submission Deadline: June 12, 2024, 11:00 Am Tender Fee: Inr 700,000 Earnest Money Deposit (Emd): Inr 67,50,000 The Project Spans A Total Length Of 35.900 Km From Armoor (Design Km. 29.100) To Medpally (Design Km. 65.000). Interested Bidders Must Submit Detailed Proposals, Including Technical And Financial Bids, In Accordance With The Specifications Outlined In The Tender Document. Keywords: Construction, Highway, Nh 63, Armoor Jagtiyal Mancherial Section, Nhai, Ham, Infrastructure Development, Government Tender, Bid Submission, Emd, Tender FeeParticulars | Details |
---|---|
Title |
Construction Of 4 Lane Highway Of Armoor Jagtiyal Mancherial Section Of Nh 63 From Armoor (Design Km. 29.100) To Medpally (Design Km. 65.000) (Total Length 35.900 Km) Under Nh(o) On Ham In The State Of Telangana (Pkg I)
|
Description |
Construction Of 4 Lane Highway Of Armoor Jagtiyal Mancherial Section Of Nh 63 From Armoor (Design Km. 29.100) To Medpally (Design Km. 65.000) (Total Length 35.900 Km) Under Nh(o) On Ham In The State Of Telangana (Pkg I)
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2023_NHAI_179817_1 |
Reference Number |
|
Tender Fee | 70000 |
EMD | 6.75 Crore |
Tender Value | |
Place | NHAI HQ |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=196857 |
Start Date | January 23, 2024 14:45 |
End Date |
25/09/2024 ( Expired 261 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreIndependent engineer services for 4 laning of paramakudi ramanathapuram sec of nh87 in tamil nadu on ham under nh(o) project length-46.665 km
Independent engineer services for 4 laning of paramakudi ramanathapuram sec of nh87 in tamil nadu on ham under nh(o) project length-46.665 km
Read moreUpgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreof your Industry type