Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Construction Of Nh 63 Armoor Jagtiyal Mancherial Section 🛣️ The National Highways Authority Of India (Nhai), As A Public Sector Undertaking, Invites Bids From Reputable Construction Firms For The Development Of A 4 Lane Highway On The Armoor Jagtiyal Mancherial Section Of Nh 63 In Telangana. 🚧 📅 Bid Submission Deadline: June 12, 2024, 11:00 Am Tender Fee: Inr 700,000 Earnest Money Deposit (Emd): Inr 67,50,000 The Project Spans A Total Length Of 35.900 Km From Armoor (Design Km. 29.100) To Medpally (Design Km. 65.000). Interested Bidders Must Submit Detailed Proposals, Including Technical And Financial Bids, In Accordance With The Specifications Outlined In The Tender Document. Keywords: Construction, Highway, Nh 63, Armoor Jagtiyal Mancherial Section, Nhai, Ham, Infrastructure Development, Government Tender, Bid Submission, Emd, Tender Fee| Particulars | Details |
|---|---|
| Title |
Construction Of 4 Lane Highway Of Armoor Jagtiyal Mancherial Section Of Nh 63 From Armoor (Design Km. 29.100) To Medpally (Design Km. 65.000) (Total Length 35.900 Km) Under Nh(o) On Ham In The State Of Telangana (Pkg I)
|
| Description |
Construction Of 4 Lane Highway Of Armoor Jagtiyal Mancherial Section Of Nh 63 From Armoor (Design Km. 29.100) To Medpally (Design Km. 65.000) (Total Length 35.900 Km) Under Nh(o) On Ham In The State Of Telangana (Pkg I)
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2023_NHAI_179817_1 |
|
Reference Number |
- |
| Tender Fee | 70000 |
| EMD | 6.75 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=196857 |
| Start Date | January 23, 2024 14:45 |
| End Date |
Expired
25/09/2024
Expired 751 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreDevelop. of 6l ac gf regional expressway on northern side of hyderabad from pragnapur vill design ch82.000 to tangad palle vill design ch160.000 for a design l of 78.000 km in the state of telangana under nh(o) on ham pkgii
Develop. of 6l ac gf regional expressway on northern side of hyderabad from pragnapur vill design ch82.000 to tangad palle vill design ch160.000 for a design l of 78.000 km in the state of telangana under nh(o) on ham pkgii
Read morePeriodic renewals of armoor-jagtial-mancherial section of nh-63 from km 28/000 to 31/000 km 37/000 to 38/000 km 41/000 to 42/000 km 45/000 to 47/000 and 51/300 to 55/400
Periodic renewals of armoor-jagtial-mancherial section of nh-63 from km 28/000 to 31/000 km 37/000 to 38/000 km 41/000 to 42/000 km 45/000 to 47/000 and 51/300 to 55/400
Read moreConsultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Read moreRehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl46.000 kms).
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl46.000 kms).
Read moreRehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.
Read moreRehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl44.085 kms)
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl44.085 kms)
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham
Read moreof your Industry type