Tender Details

Particulars Details
Title
Maintenance Of Road From I. Damcherra Khedacherra Road To Khedacherra Phc Approach Road From Ch.0.00 Km To Ch.0.30 Km Total Length 0.30 Km Ii. Khedacherra Duganga Road To Khedacherra Panchayat Approach Road From Ch.0.00 Km To Ch.0.10 Km Total Lengt
Description
Maintenance Of Road From I. Damcherra Khedacherra Road To Khedacherra Phc Approach Road From Ch.0.00 Km To Ch.0.30 Km Total Length 0.30 Km Ii. Khedacherra Duganga Road To Khedacherra Panchayat Approach Road From Ch.0.00 Km To Ch.0.10 Km Total Lengt
Organisation Chief Engineer, PWD (R and B) | State Govt. and UT
Tender Id 2025_CEPWD_60697_1
Reference
Number
103/EE/KCP/2025-26.
Tender Fee 1000
EMD 31503
Tender Value
Place Damcherra
Link https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=61733
Start Date May 02, 2025 00:00
End Date

07/05/2025 ( Expired 6 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Read more
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Read more
Strengthening of tumsar to bhandara section of nh-543k from km 82.00 to km 112.00 (excluding section from km 108.00 to 110.00) on epc mode in the state of maharashtra. total length 28.00 km

Strengthening of tumsar to bhandara section of nh-543k from km 82.00 to km 112.00 (excluding section from km 108.00 to 110.00) on epc mode in the state of maharashtra. total length 28.00 km

Read more
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme

Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme

Read more
Maintenance work of sindoor river to start of bareli bypass section of nh-12 from existing km 130.10 to km 194.0 (design ch. 130.000 to ch. 193.000) in the state of m.p. to four lanes with paved shoulders on epc mode under nhdp-iii (package iii) on t

Maintenance work of sindoor river to start of bareli bypass section of nh-12 from existing km 130.10 to km 194.0 (design ch. 130.000 to ch. 193.000) in the state of m.p. to four lanes with paved shoulders on epc mode under nhdp-iii (package iii) on t

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)

Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)

Read more
Construction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state

Construction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state

Read more
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Read more
Click Here to Download Dockets
of your Industry type