Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance Of Road From Damcherra Khedacherra Road To Boraipara Mizoram Border From Ch.0.00 Km To Ch.0.27 Km Total Length 0.27 Km Under Damcherra Sub Division During The Year 202 2025 Sh Side Shouldering,Wbm 3, Paver Block, Pcc Works Etc. Gr I.
|
| Description |
Maintenance Of Road From Damcherra Khedacherra Road To Boraipara Mizoram Border From Ch.0.00 Km To Ch.0.27 Km Total Length 0.27 Km Under Damcherra Sub Division During The Year 202 2025 Sh Side Shouldering,Wbm 3, Paver Block, Pcc Works Etc. Gr I.
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2025_CEPWD_57609_1 |
|
Reference Number |
198/EE/KCP/2024-2025 |
| Tender Fee | 1000 |
| EMD | 48084 |
| Tender Value | |
| Place | Damcherra |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=58591 |
| Start Date | January 30, 2025 00:00 |
| End Date |
Expired
05/03/2025
Expired 456 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening of road from kanchanpur to machmara from ch 4.00 km to ch 12.50 km , under jampui hill sub-division, pwd r and b during the f.y. 2025 2026 sh side shouldering, repair pot holes, bm, tack coat, carpeting, seal coat, surface drain, mtc
Strengthening of road from kanchanpur to machmara from ch 4.00 km to ch 12.50 km , under jampui hill sub-division, pwd r and b during the f.y. 2025 2026 sh side shouldering, repair pot holes, bm, tack coat, carpeting, seal coat, surface drain, mtc
Read moreStrengthening of road from kanchanpur to machmara from ch 12.50 km to ch 19.126 km , under jampui hill sub-division, pwd r and b during the f.y. 2025 2026 sh side shouldering, repair pot holes, bm,tack coat, carpeting, seal coat, surface drain, mtc
Strengthening of road from kanchanpur to machmara from ch 12.50 km to ch 19.126 km , under jampui hill sub-division, pwd r and b during the f.y. 2025 2026 sh side shouldering, repair pot holes, bm,tack coat, carpeting, seal coat, surface drain, mtc
Read moreImp of road frm d.k. rd to k.k. rd via zela parisad office l 1.95 km portion from 0.00 to 1.70 km under part-xi impl. of sna sparsh mode) of the sh gsb, wbm 2,wbm 3, seal coating, rd side drain, road signage etc. comp. job no.tpcom183 2025 26
Imp of road frm d.k. rd to k.k. rd via zela parisad office l 1.95 km portion from 0.00 to 1.70 km under part-xi impl. of sna sparsh mode) of the sh gsb, wbm 2,wbm 3, seal coating, rd side drain, road signage etc. comp. job no.tpcom183 2025 26
Read moreMungpoo rambhibazar road clearing darin, cd structures, drops and guides mixed slip clearacne and jungle cutting from ch. 6.10kmp to 12.00 km
Mungpoo rambhibazar road clearing darin, cd structures, drops and guides mixed slip clearacne and jungle cutting from ch. 6.10kmp to 12.00 km under darjeeling highway division in the district of darjeeling during the year 2026-27.
Read moreMaheshganj nabadwip ghat road from 0.80 km. to 1.80 km. patch repairing and maintenance work under krishnagar highway sub-division no.-1 of nadia highway division no-i, p.w.(roads) dte. in the district of nadia during the year 2026-27
Read moreMaintenance of road from damcherra khedacherra road to boraipara mizoram border from ch.0.27km to ch.0.54km total length 0.27km under damcherra sub division during the year 2024 2025 sh side shouldering, wbm 3, paver block, pcc works etc.gr ii.
Maintenance of road from damcherra khedacherra road to boraipara mizoram border from ch.0.27km to ch.0.54km total length 0.27km under damcherra sub division during the year 2024 2025 sh side shouldering, wbm 3, paver block, pcc works etc.gr ii.
Read moreMaintenance of road from ballukcherra to khedacherra from ch.0.00km to ch.35.20 km total length 35.20 km under damcherra sub division, pwd r and b during the year 2025 2026 sh road studs etc.
Maintenance of road from ballukcherra to khedacherra from ch.0.00km to ch.35.20 km total length 35.20 km under damcherra sub division, pwd r and b during the year 2025 2026 sh road studs etc.
Read moreMaintenance of road from ballukcherra to khedacherra from ch 0.00km to ch 35.20 km total length 35.20 km under damcherra sub-division, pwd r and b during the year 2025 2026 sh road studs etc.
Maintenance of road from ballukcherra to khedacherra from ch 0.00km to ch 35.20 km total length 35.20 km under damcherra sub-division, pwd r and b during the year 2025 2026 sh road studs etc.
Read moreUrgent flood damage repair of road from damcherra khedacherra road to tabjirai para from ch.0.00km to ch.1.00km total length 1.00km under damcherra sub division, pwd randb during the year 2024 2025 sh patch metalling, patch carpeting, seal coating ,
Urgent flood damage repair of road from damcherra khedacherra road to tabjirai para from ch.0.00km to ch.1.00km total length 1.00km under damcherra sub division, pwd randb during the year 2024 2025 sh patch metalling, patch carpeting, seal coating ,
Read moreMaintenance of road from damcherra khedacherra road to uttamjoy para via tabjirai para from ch.0.00km to ch.2.30km total length 2.30km under damcherra sub division, pwd r and b during the year 2025 2026 sh patch metalling,grouting,carpeting, seal
Maintenance of road from damcherra khedacherra road to uttamjoy para via tabjirai para from ch.0.00km to ch.2.30km total length 2.30km under damcherra sub division, pwd r and b during the year 2025 2026 sh patch metalling,grouting,carpeting, seal
Read moreof your Industry type