Tender Details
Particulars | Details |
---|---|
Title |
Consultancy Work For Site Selection, Detailed Survey, Soil Testing, Drawing And Design, Preparing Of D.P.R. For Construction Of 80.00 Meter Span Suspension Bridge In Tok Kunchaso, Village Bungbung Under Dharchula Assembly Constituency In District Pit
|
Description |
Consultancy Work For Site Selection, Detailed Survey, Soil Testing, Drawing And Design, Preparing Of D.P.R. For Construction Of 80.00 Meter Span Suspension Bridge In Tok Kunchaso, Village Bungbung Under Dharchula Assembly Constituency In District Pit
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_pwd_79070_1 |
Reference Number |
1618/2 AC Date 19-12-2024 |
Tender Fee | 1770 |
EMD | 22400 |
Tender Value | |
Place | Askote |
Link | https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=94436 |
Start Date | December 26, 2024 16:30 |
End Date |
13/01/2025 ( Expired 142 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and cost estimate for construction of gumdesh kayal to talladesh ramela motor length 11.00 km and 40 mtr span motor bridge over lohawati river in constituency lohaghat of district champawat under state sector
Design and cost estimate for construction of gumdesh kayal to talladesh ramela motor length 11.00 km and 40 mtr span motor bridge over lohawati river in constituency lohaghat of district champawat under state sector
Read moreSurvey design fabrication supply installation testing commissioning of on-grid srt project with net meter and rms of 355 kw at various 24 govt/ semi govt offices buildings in satara district of maharashtra with cmc for 5 years
Survey design fabrication supply installation testing commissioning of on-grid srt project with net meter and rms of 355 kw at various 24 govt/ semi govt offices buildings in satara district of maharashtra with cmc for 5 years
Read moreSelection of design consultancy for formation of 17km of new footpath including site documentation and conceptual design drawing development site implementation support with standard design considerations, and preparation and submission of boq in z
Selection of design consultancy for formation of 17km of new footpath including site documentation and conceptual design drawing development, site implementation support with standard designconsiderations and preparation and submissionof boq in z1to7
Read moreSelection of design consultancy for formation of 18 km of new footpath including site documentation and conceptual design drawing development, site implementation support, with standard design considerations, and preparation and submission of boq in
Selectionof design consultancy for formationof 18km of newfootpath including site documentation and conceptual design drawing development, site implementation support with standard designconsiderations, and preparation and submissionof boq in z 8to15
Read moreConsultancy services of survey work, soil testing, design, drawing, preparation of dpr, vat, forest land and land acquisition file for con of road from two lanes to four lanes from km. 02 to 23 of km 16 of rishikesh bhaniyawala marg to airport
Consultancy services of survey work, soil testing, design, drawing, preparation of dpr, vat, forest land and land acquisition file for con of road from two lanes to four lanes from km. 02 to 23 of km 16 of rishikesh bhaniyawala marg to airport
Read moreDesign and cost estimate work of survey,soil testing,design,drawing,dpr preparation(including vat from any reputed government technical institute) for construction work of guest house of public work department in garkhet, block jaunpur
Design and cost estimate work of survey,soil testing,design,drawing,dpr preparation(including vat from any reputed government technical institute) for construction work of guest house of public work department in garkhet, block jaunpur
Read moreDetail survey and consultancy work for preparation of detailed project report (dpr) for construction of karanpur ghati road with safety walls in karanpur ghati on sh-123 km. 65/500 to 68/500 with sbc tests by bore on site design and drawing of sa
Detail survey and consultancy work for preparation of detailed project report (dpr) for construction of karanpur ghati road with safety walls in karanpur ghati on sh-123 km. 65/500 to 68/500 with sbc tests by bore on site design and drawing of sa
Read moreSite selection detailed survey soil testing drawing design preparing of dpr and vetting from iit delhi kanpur mumbai varanasi etc. for construction of 200 m span double lane 70r class a motor bridge over alaknanda river near seetasain mulya villag
Site selection detailed survey soil testing drawing design preparing of dpr and vetting from iit delhi kanpur mumbai varanasi etc. for construction of 200 m span double lane 70r class a motor bridge over alaknanda river near seetasain mulya villag
Read moreSite survey, design, engineering, manufacturing/ procurement, testing, supply, installations and commissioning, 05 years comprehensive maintenance for 100 nos of solar powered irrigation pumps in uttar dinajpur district, west bengal.
Site survey, design, engineering, manufacturing/ procurement, testing, supply, installations and commissioning, 05 years comprehensive maintenance for 100 nos of solar powered irrigation pumps in uttar dinajpur district, west bengal.
Read moreSite selection, detailed survey, soil testing, drawing and design preparing of dpr and vetting from iit delhi/kanpur/mumbai/varanasi etc. for construction of 200 m span double lane 70r/ class a motor bridge over alaknanda river near seetasain, muly
Site selection, detailed survey, soil testing, drawing and design preparing of dpr and vetting from iit delhi/kanpur/mumbai/varanasi etc. for construction of 200 m span double lane 70r/ class a motor bridge over alaknanda river near seetasain, muly
Read moreof your Industry type