Tender Details
Particulars | Details |
---|---|
Title |
Talheri Estimate For Providing And Installing 1 No. New Tubewell In Place Of Failed Tubewell At Village Talheri, Distt. Kurukshetra
|
Description |
Dnit For Laying Of Di Rising Main For Connecting Tubewell, Prov. And Installing 1 No. Tubewell With Pumping Machinery Completed In Village Talheri And All Other Other Works Contingent Thereto
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2025_HRY_430520_1 |
Reference Number |
202534A00A8A 91E9 44C9 B377 809754698614596PUH |
Tender Fee | 2180 |
EMD | 24880 |
Tender Value | |
Place | TALHERI |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=507506 |
Start Date | February 24, 2025 23:30 |
End Date |
03/03/2025 ( Expired 49 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreChartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Read moreTender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Tender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreConst. of ec for gammon junc at km. 903.265 (blackspot id no. ap(05)-092)and diwancheruvu junc at km. 902.308(blackspot id no.ap(03)-299) on nh16 in andhra pradesh under nh(o) on epc mode
Const. of ec for gammon junc at km. 903.265 (blackspot id no. ap(05)-092)and diwancheruvu junc at km. 902.308(blackspot id no.ap(03)-299) on nh16 in andhra pradesh under nh(o) on epc mode
Read moreProvision of new building for rnd equipment and test facilities under htcc at rci, hyderabad
Provision of new building for rnd equipment and test facilities under htcc at rci, hyderabad
Read moreAAAAAAAAAA
Login to viewLaying of new upvc di pipe line for interconnection in the distribution system and bridge culvert crossing and other allied works in connection with kumargram augmentation pwss under alipurduar division phe dte.
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreConstruction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreConstruction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreof your Industry type