Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏞️ Invitation For Bids: Renovation Of Water Supply System In Sagwan Village 🚿 The Haryana Government, Through The State Govt. And Ut, Invites Bids From Eligible Contractors For The Renovation Of The Water Supply System In Sagwan Village, Under The Jurisdiction Of Executive Engineer Phed Tosham. 📅 Bid Submission Deadline: July 10, 2024, 1:00 Pm The Project Involves Providing And Fixing A New Motor Pump For The Water Works Riwasa 2nd. Interested Bidders Must Submit A Tender Fee Of Inr 2180 And An Earnest Money Deposit (Emd) Of Inr 15300. Detailed Project Specifications And Tender Documents Can Be Obtained From The Office Of The Executive Engineer Phed Tosham. Keywords: Sagwan Village, Water Supply Renovation, Phed, Haryana Government, Tender, Emd, Bid SubmissionParticulars | Details |
---|---|
Title |
Sagwan Village Estimate Aug./Renovation Of Water Supply Fhtc
|
Description |
Providing Fixing New Motor Pump Water Works Riwasa 2nd
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2024_HRY_384157_1 |
Reference Number |
7173 |
Tender Fee | 2180 |
EMD | 15300 |
Tender Value | |
Place | Executive Engineer PHED Tosham |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=460329 |
Start Date | June 27, 2024 22:30 |
End Date |
10/07/2024 ( Expired 342 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of hydraulic insulator testing jig for tensile load testing of 25kv porcelain and composite insulator as per rdso spec. no. ti/spc/ohe/instest/0090/(02/2009) rev o or latest.
For complete deion and other details, please refer to tender
Read moreDigging and renovation of mahamai pond village dohtara block tindwari lot-12
Digging and renovation of mahamai pond village dohtara block tindwari lot-12
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreSupply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server
Supply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreSupply of aerial fuse of current production
Invitation of bids for supply of aerial fuse of current production
Read moreof your Industry type