Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Improvement /Up Gradation Of Compound/ Street Light And Other Associated Work To Be Carried Out In D.S. Kothari Hostel, University Of Delhi.
|
Description |
Improvement /Up Gradation Of Compound/ Street Light And Other Associated Work To Be Carried Out In D.S. Kothari Hostel, University Of Delhi.
|
Organisation | Delhi University | Central Govt. Ministry/Department |
Tender Id | 2024_DU_810872_1 |
Reference Number |
CEET-5679 |
Tender Fee | 500 |
EMD | 19887 |
Tender Value | |
Place | North Campus |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=852154 |
Start Date | June 10, 2024 23:30 |
End Date |
24/06/2024 ( Expired 364 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreConstruction for infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds (residential part, non residential part, elect part, and it infrastructure work), utttar dinajpur-- sitc of dg set
Construction for infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds (residential part, non residential part, elect part, and it infrastructure work), utttar dinajpur. --sitc of dg set
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreOne time improvement of riding quality of left out portions of nh-08 beawar gomti pkg-1 jawaja (new km 74/300 to 76/900) and balacharat (new km 101/300 to 102/400) in the state of rajasthan
One time improvement of riding quality of left out portions of nh-08 beawar gomti pkg-1 jawaja (new km 74/300 to 76/900) and balacharat (new km 101/300 to 102/400) in the state of rajasthan
Read moreConstruction work of cc drain in ward number 6 from pramod bairagi house to behind the bus stand, near gillu kabade in the street opposite shiv madia and at other places.
Construction work of cc drain in ward number 6 from pramod bairagi house to behind the bus stand, near gillu kabade in the street opposite shiv madia and at other places.
Read moreAAAAAAAAAA
Login to viewConstruction of 800 bedded girls hostel (s plus g plus 10), kitchen and dining block (g plus 6) and hvac building (g plus 1) i/c internal water supply, sanitary installation, drainage, sewerage, water supply, u.g. tank (500000 liter), storm water drains, roads paths, internal e.i. fans, wet riser system, fire alarm system, ups system, cctv system, hydro pneumatic water supply system, substation equipment, central ac plant, illuminated signages, street lighting, lifts, horticulture landscaping and other development work bulk services (civil electrical) in main campus at iit(ism) dhanbad (package-i).
Read moreMaintenance work on up/haryana border -yamunanagar- saha-panchkula section of (old nh-73) (new nh-344) from km. 71.400 to km. 176.400 (package-1,2, 3) in the state of haryana and allied works on zirakpur-parwanoo section of nh-05.
Maintenance work on up/haryana border -yamunanagar- saha-panchkula section of (old nh-73) (new nh-344) from km. 71.400 to km. 176.400 (package-1,2, 3) in the state of haryana and allied works on zirakpur-parwanoo section of nh-05.
Read moreCa no ge(u)/chm-30/2025-26 certain repairs to joinery, flooring, wall tiling, false ceiling, wall panelling work etc in ground floor and first floor of command hospital and other various location under age b/r (ch) of ge(u) chandimandir
Ca no ge(u)/chm-30/2025-26 certain repairs to joinery, flooring, wall tiling, false ceiling, wall panelling work etc in ground floor and first floor of command hospital and other various location under age b/r (ch) of ge(u) chandimandir
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreof your Industry type