Tender Details

Particulars Details
Title
Supply Of Inverter Hot And Cold Split Air Conditioners At Cvas Bikaner
Description
Supply Of Inverter Hot And Cold Split Air Conditioners At Cvas Bikaner
Organisation Government of Rajasthan
Tender Id 2023_RAJUV_366871_1
Reference
Number
NIT 06 of 2023-24
Tender Fee 1000
EMD 36000
Tender Value -
Place Dean CVAS Bikaner
Link
View Original Tender Notice

https://eproc.rajasthan.gov.in

Start Date September 15, 2023 18:30
End Date
Expired 26/09/2023

Expired 1111 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply and installation of tower type split air conditioners with all necessary accessories - for utilisation at various locations of pjhes(revulapally(v), jogulamba gadwal (dist.)) and ljhes(atmakur(v),wanaparthy(dist.))

Supply and installation of tower type split air conditioners with all necessary accessories - for utilisation at various locations of pjhes(revulapally(v), jogulamba gadwal (dist.)) and ljhes(atmakur(v),wanaparthy(dist.))

Read more
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally

Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Supply of air conditioners at cvas bikaner

Supply of air conditioners at cvas bikaner

Read more
Sitc of hot and cold dc inverter type split type air conditioners at guest house ,rajbhawan.

Sitc of hot and cold dc inverter type split type air conditioners at guest house ,rajbhawan.

Read more
Procurement of hot and cold inverter split air conditioners for chemical laboratory at sgtps mppgcl birsinghpur.

Procurement of hot and cold inverter split air conditioners for chemical laboratory at sgtps mppgcl birsinghpur.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise