Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Inverter Hot And Cold Split Air Conditioners At Cvas Bikaner
|
| Description |
Supply Of Inverter Hot And Cold Split Air Conditioners At Cvas Bikaner
|
| Organisation | Government of Rajasthan |
| Tender Id | 2023_RAJUV_366871_1 |
|
Reference Number |
NIT 06 of 2023-24 |
| Tender Fee | 1000 |
| EMD | 36000 |
| Tender Value | - |
| Place | Dean CVAS Bikaner |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in |
| Start Date | September 15, 2023 18:30 |
| End Date |
Expired
26/09/2023
Expired 1111 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply and installation of tower type split air conditioners with all necessary accessories - for utilisation at various locations of pjhes(revulapally(v), jogulamba gadwal (dist.)) and ljhes(atmakur(v),wanaparthy(dist.))
Supply and installation of tower type split air conditioners with all necessary accessories - for utilisation at various locations of pjhes(revulapally(v), jogulamba gadwal (dist.)) and ljhes(atmakur(v),wanaparthy(dist.))
Read moreSupply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreSitc of hot and cold dc inverter type split type air conditioners at guest house ,rajbhawan.
Sitc of hot and cold dc inverter type split type air conditioners at guest house ,rajbhawan.
Read moreProcurement of hot and cold inverter split air conditioners for chemical laboratory at sgtps mppgcl birsinghpur.
Procurement of hot and cold inverter split air conditioners for chemical laboratory at sgtps mppgcl birsinghpur.
Read moreof your Industry type