Tender Details
Particulars | Details |
---|---|
Title |
Construction And Metalling Tarring Mata Chintpurni To Amlehar Road From Km 000 To 9350 Sh Construction Of 14 40 Mtr Span Cc Rcc Solid Slab Bridge Over Dhalwari Khad At Rd 4 155
|
Description |
Construction And Metalling Tarring Mata Chintpurni To Amlehar Road From Km 000 To 9350 Sh Construction Of 14 40 Mtr Span Cc Rcc Solid Slab Bridge Over Dhalwari Khad At Rd 4 155
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_104249_1 |
Reference Number |
Mata Chintpurni to Amlehar Bridge Jo-1 |
Tender Fee | 2000 |
EMD | 1.17 Lakh |
Tender Value | |
Place | Bharwain |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=152885 |
Start Date | April 22, 2025 22:30 |
End Date |
02/05/2025 ( Expired 34 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreDesign and cost estimate for construction of gumdesh kayal to talladesh ramela motor length 11.00 km and 40 mtr span motor bridge over lohawati river in constituency lohaghat of district champawat under state sector
Design and cost estimate for construction of gumdesh kayal to talladesh ramela motor length 11.00 km and 40 mtr span motor bridge over lohawati river in constituency lohaghat of district champawat under state sector
Read moreConstruction of 1x20 mtr span plate girder rcc decked bridge over maloori nallah at sarabagh alongwith road from sarabagh to dara health centre on epc mode (engineering procurement and construction mode
Construction of 1x20 mtr span plate girder rcc decked bridge over maloori nallah at sarabagh alongwith road from sarabagh to dara health centre on epc mode (engineering procurement and construction mode
Read moreConstruction of high level bridge single span steel truss 36.00 m eff. over sirhind canal x-ing gobindpura to bathinda-talwandi road via bhucho kalan at rd 7.60 km including approaches under pmgsy-iii (batch-i) package no pb-02 046, block nathana, di
Construction of high level bridge single span steel truss 36.00 m eff. over sirhind canal x-ing gobindpura to bathinda-talwandi road via bhucho kalan at rd 7.60 km including approaches under pmgsy-iii (batch-i) package no pb-02 046, block nathana, di
Read moreConst of hl bridge single span steel truss 36.00 each eff over sirhind canal xing bhucho kalan to nathana via seema poohli at rd 8.70 km inc appr road diversion dismantling 2.5 m high rcc retaining wall etc pmgsyiii batch i pac no pb02 047
Const of hl bridge single span steel truss 36.00 each eff over sirhind canal xing bhucho kalan
 to nathana via seema poohli at rd 8.70 km inc appr. road diversion dismantling and 2.5 m high rcc retaining wall etc pmgsyiii batch-i pac no pb-02 047 
Read moreConstruction of 19 m long span rcc t beam bridge over ghudwin khad at km 4785 on hamirpur bhoranj jahu road t04 from km 0000 to km 14000 under pmgsy3 batchi package no hp03168b
Construction of 19 m long span rcc t beam bridge over ghudwin khad at km 4785 on hamirpur bhoranj jahu road t04 from km 0000 to km 14000 under pmgsy3 batchi package no hp03168b
Read moreConstruction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Construction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Read moreConstruction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Construction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Read moreConstruction of rcc foot bridge over garai river to connect village of naramohan para and panchayat office under hezamara rd block, sh- construction of approach road with 80mm thick paver block.
Construction of rcc foot bridge over garai river to connect village of naramohan para and panchayat office under hezamara rd block, sh- construction of approach road with 80mm thick paver block.
Read moreof your Industry type