Tender Details
Particulars | Details |
---|---|
Title |
Balance Work Of Piped Water Supply Scheme Under Jal Jeevan Mission
|
Description |
Balance Work Of Piped Water Supply Scheme Under Jal Jeevan Mission
|
Organisation | Public Health Engineering- O/o Engineer In Chief | State Govt. and UT |
Tender Id | 2025_PHED_422350_1 |
Reference Number |
NIT14EEPHE2025MORENA09.05.2025 |
Tender Fee | 5489 |
EMD | 50000 |
Tender Value | |
Place | MORENA |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=497666 |
Start Date | May 09, 2025 22:30 |
End Date |
20/05/2025 ( Expired 5 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Read moreDc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moreAppointment of consultant for verification and monitoring of the facilities for consideration under humsafar scheme of national highways logistics management limited
Appointment of consultant for verification and monitoring of the facilities for consideration under humsafar scheme of national highways logistics management limited
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreProvision of ug sump cum pump house station for water supply under wp 02 at naval station rambilli near visakhapatnam
Provision of ug sump cum pump house station
Read moreWork of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreAllotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Read moreWork servises for provision of infrastructure for
Work servises for provision of infrastructure for
 induction of trainer aircraft at afa under ge(afa) hyderabad.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreof your Industry type