Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ot 29
|
| Description |
Removal Of Accumulated Fly Ash Silt From All The Drains Around Silo ,Drains From Silo Gate To Chp Gate, Drains From Wagon Tippler Mcc &Amp#X0d
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_493816_1 |
|
Reference Number |
CE/MTPS-II/SE/Civil/OT.No. 29 / 2024-25. |
| Tender Fee | 0 |
| EMD | 4500 |
| Tender Value | - |
| Place | MTPS-II- Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=586721 |
| Start Date | October 15, 2024 22:15 |
| End Date |
Expired
19/10/2024
Expired 730 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Reconstruction of damaged bearing pedestals of wagon tippler 1 at chp btps
Reconstruction of damaged bearing pedestals of wagon tippler - 1 at chp,ballari themal power station (btps)
Read moreSale of dry fly ash from silo of 1x660 mw, panki thermal
Sale of dry fly ash from silo of 1x660 mw, panki thermal power project, uprvunl, panki, kanpur
Read moreProcurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Procurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Read moreSupply and commissioing of ups with battery for emergency light in underground conveyorsand wagon tippler complex in chp telangana
Supply and commissioing of ups with battery for emergency light in underground conveyorsand wagon tippler complex in chp telangana
Read moreKtps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Ktps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Read moreAnnual work contract for cleaning of accumulated fly ash dust around the silos of phi phii phiii silo area roads open space near silos by hiring the jcb machine with diesel and operator and loading into trucks dispose off into ash sump of 4x
Annual work contract for cleaning of accumulated fly ash dust around the silos of phi phii phiii silo area roads open space near silos by hiring the jcb machine with diesel and operator and loading into trucks dispose off into ash sump of 4x
Read moreCollection, preparation, transportation and analysis of feeder coal, mill reject coal, bottom ash and fly ash, pc sample, coal samples from conveyor belts of chp-1 and chp-2, stockyard, collection and preparation of kecm rakes from wagon top at wts and any other special coal samples at rtps
Collection, preparation, transportation and analysis of feeder coal, mill reject coal, bottom ash and fly ash, pc sample, coal samples from conveyor belts of chp-1 and chp-2, stockyard, collection and preparation of kecm rakes from wagon top at wts and any other special coal samples at rtps
Read moreProcurement of complete assembly of vent fan modelno.hcmb-3-50-1-3 installed in silo in fly ash system of ahp-iv of stps, sarni.
Procurement of complete assembly of vent fan modelno.hcmb-3-50-1-3 installed in silo in fly ash system of ahp-iv of stps, sarni.
Read moreBiennial 02 years work contract for operation and maintenance along with housekeeping of coal handling plant chp i 4x210mw and wagon tippler along with alternate coal path and chp ii of 1x500 mw and manual unloading of coal from coal rake at sgtps
Biennial 02 years work contract for operation and maintenance along with housekeeping of coal handling plant chp i 4x210mw and wagon tippler along with alternate coal path and chp ii of 1x500 mw and manual unloading of coal from coal rake at sgtps
Read moreAnnual maintenance service contract for weighing equipments at wagon tippler and track hopper of m/s avery india pvt ltd., make for the year 2027 in chp at ktps-v and vi stages
Annual maintenance service contract for weighing equipments at wagon tippler and track hopper of m/s avery india pvt ltd., make for the year 2027 in chp at ktps-v and vi stages
Read moreof your Industry type