Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Etender/Gpk/Ffc/08/2023 24
|
| Description |
Etender/Gpk/Ffc/08/2023 24
|
| Organisation | RDD-CEO-SOLAPUR | State Govt. and UT |
| Tender Id | 2024_SOLAP_1066479_1 |
|
Reference Number |
Etender/GPK/08/2024-25 |
| Tender Fee | 200 |
| EMD | 0 |
| Tender Value | - |
| Place | GRAMPANCHAYAT KACHAREWADI |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1860956 |
| Start Date | August 07, 2024 23:00 |
| End Date |
Expired
12/08/2024
Expired 772 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreof your Industry type