Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Bua Road To Chhedapurwa Link Road With Five Year Mentinance
|
| Description |
Construction Of Bua Road To Chhedapurwa Link Road With Five Year Mentinance
|
| Organisation | Chief Engineer PWD Central Zone,Lucknow | State Govt. and UT |
| Tender Id | 2025_CEUCZ_1094051_1 |
|
Reference Number |
6077 M /1MT/ E-Tender/ U.C/2025 Dated 15.11.2025 |
| Tender Fee | 2714 |
| EMD | 8.85 Lakh |
| Tender Value | - |
| Place | SUPERINTENDING ENGINEER UNNAO CIRCLE PWD UNNAO |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2011323 |
| Start Date | November 27, 2025 17:30 |
| End Date |
Expired
02/12/2025
Expired 313 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply and installation of 1350 (90watt.) and 1500 (120wtat.) led street lights with maintenance for five years in ward of nagar parishad, khagaul
Supply and installation of 1350 (90watt.) and 1500 (120wtat.) led street lights with maintenance for five years in ward of nagar parishad, khagaul
Read moreSupply, installation, testing and commissioning of 30w solar led street lighting system with five (05) years comprehensive maintenance in near by villages of kasipet, muthyampalli, chinna dharmaram.
Supply, installation, testing and commissioning of 30w solar led street lighting system with five (05) years comprehensive maintenance in near by villages of kasipet, muthyampalli, chinna dharmaram.
Read moreLaying of missing link d.i. pipe line from pirmuhani more to jaypur hotel gali in ward no. 36
Laying of missing link d.i. pipe line from pirmuhani more to jaypur hotel gali in ward no. 36
Read moreDismantling of old chain link fencing and providing compound wall allround kpcl quarters at bhep colony- phase iv
Replacement of damaged chain-link fencing with construction of a compound wall with barbed wire on top along the boundary of bhadra colony for a balance length of 410m.
Read moreWidening and strengthning of naubasta chamrupur shamserganj ajgara bahuhara bojhwa road (odr) ch-0.000 to 1.700, ch. 4.700 to 6.700 and ch. 14.250 to 23.600 in district pratapgarh fy -2026-27 with five year maintenance (1)
Widening and strengthning of naubasta chamrupur shamserganj ajgara bahuhara bojhwa road (odr) ch-0.000 to 1.700, ch. 4.700 to 6.700 and ch. 14.250 to 23.600 in district pratapgarh fy -2026-27 with five year maintenance (1)
Read moreConstruction of hot dipped galvanized iron chain link mesh or compound wall of r and b circuit guest house in mahabubnagar district.
Construction of hot dipped galvanized iron chain link mesh or compound wall of r and b circuit guest house in mahabubnagar district.
Read moreProviding see through wall with pvc coated chain link mesh around amenities building in ip-sultanpur, sangareddy district (reserved for sc only)
Providing see through wall with pvc coated chain link mesh around amenities building in ip-sultanpur, sangareddy district (reserved for sc only)
Read moreProviding chain link mesh for ward office at tngos colony in ward-117, mailardevpally div in attapur circle.( reserved for waddera /sagara communtties) (rs. 2.85 lakhs)
Providing chain link mesh for ward office at tngos colony in ward-117, mailardevpally div in attapur circle.( reserved for waddera /sagara communtties) (rs. 2.85 lakhs)
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreSitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar
Sitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar
Read moreof your Industry type