Tender Details

About Tender

🏗️ Invitation For Bids: Construction Project At Debnibus W/S 🌱 The Public Health Engineering (Phe) Department Of The State Government And Union Territories Invites Bids For The Construction Of A Boundary Wall, Land Development, Plinth Protection, And An Approach Road For The Pump House At The Head Work Site Of The Debnibus Water Supply Scheme In Block Namkhana. 📅 Bid Submission Deadline: April 17, 2024, 3:00 Pm The Earnest Money Deposit (Emd) Is Set At Inr 57,936. Interested Contractors Must Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Project Specifications. Keywords: Construction, Boundary Wall, Land Development, Plinth Protection, Approach Road, Pump House, Debnibus W/S, Phe, State Govt. And Ut, Government Tender, Emd
Particulars Details
Title
N Ie T 145/23 24/07
Description
Construction Of Boundary Wall Along With Land Development And Plinth Protection And Approach Road For Pump House At Head Work Site Of Debnibus W/S Scheme, Block Namkhana
Organisation PHE | State Govt. and UT
Tender Id 2024_PHED_686124_16
Reference
Number
WBPHED/EE/NIeT-145/AD/2023-24
Tender Fee 0
EMD 57936
Tender Value -
Place Block - Namkhana
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1494817

Start Date March 18, 2024 16:30
End Date
Expired 17/04/2024

Expired 898 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Niet-144/23-24/07

Construction of 1 no. pump house of size 5.40 mtr. x 3.60 mtr. at 3rd tubewell site for naraharipur water supply scheme, block - sagar for implementation of jjm under kakdwip sub-division of alipore division, p.h.e. dte. (sm/18876)

Read more
Niet-101/23-24/07

Construction of boundary wall along with land development, plinth protection and approach road for pump house at 3rd tubewell site for augmentation of krishnanagar w/s scheme, block - sagar under jjm of kakdwip sub-division under alipore division, p.

Read more
Niet-100/23-24/07

Construction of boundary wall along with land development, plinth protection and approach road for pump house at 2nd tubewell site of rajrajeshwarpur w/s scheme, block pathar pratima under jjm of kakdwip sub-division under alipore division, p.h.e.

Read more
Niet-98/23-24/07

Protection works and land filling at the head work site of radhakantapur abad w/s scheme, modified as zone- xiv of mathurapur-ii block in connection with jal jeevan mission (jjm) for mega surface water-based water supply scheme for falta-mathurapur.

Read more
Niet-94/23-24/07

Construction of boundary wall along with land development, plinth protection and approach road for pump house at 1st tubewell site of narayanganj w/s scheme, block - namkhana under jjm of kakdwip sub-division under alipore division, p.h.e. dte.

Read more
Niet-81/23-24/07

Construction of 1 (one) no. switch room cum chlorine room (5.4m x 3.6m) including sanitary arrangement as per departmental drawing at the site of matherdighi w/s scheme (zone-i, ii and iii), block - canning-ii (zone-iii, pump house no.- i)

Read more
Niet-93/23-24/07

Construction of boundary wall along with land development and plinth protection and approach road for pump house at head work site of krishnadaspur w/s scheme, block - pathar pratima under jjm of kakdwip sub-divn under alipore division, phe dte.

Read more
Niet-57/23-24/07

Construction of temporary hogla structures for other govt. organizations, police staffs, new bus stand (k2), maintenance of mobile toilet unit, painting of m.s. fire fighting tank, special latrine at sagar mela ground in connection with g.s mela 2024

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise