Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Overhauling Of 6.6 Kv Switchgear Panel Of 210 Mw, Unit 6, Ptps, Panipat During Overhauling As Per Scope Of Work File No. 6157
|
Organisation | Haryana Board Corporation | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2360 |
EMD | 6400 |
Tender Value | |
Place | ASSAN KALAN |
Link |
AAAAAAAAAA Login to view |
Start Date | July 02, 2025 22:30 |
End Date |
17/07/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Complete overhauling of 6.6 kv various capacities motors (17 nos.) of unit no. 3 of 3x210 mw, atps, anpara
Complete overhauling of 6.6 kv various capacities motors (17 nos.) of unit no. 3 of 3x210 mw, atps, anpara
Read moreOverhauling of 16 mva, 15.75/ 6.9 kv unit auxiliary transformer (uat) during overhauling of unit no.3
Overhauling of 16 mva, 15.75/ 6.9 kv unit &#x0d auxiliary transformer (uat) during overhauling &#x0d of unit no.3
Read moreWork contract for annual prive/breakdown maintenance of non pressure parts of boiler and its auxiliaries for unit no. 1 to 4 of 210 mw of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Work contract for annual prive/breakdown maintenance of non pressure parts of boiler and its auxiliaries for unit no. 1 to 4 of 210 mw of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Read moreModification work of 132 kv s/c ratangarh- parasneu tr. line bw loc no. 6 and 7 at railway track crossing between railway tp point 03/7 and 3/8 of ratagarh-sardarshahar section as deposit work of ms. railway (mlin/22.17) on labour rate contract basis
Modification work of 132 kv s/c ratangarh- parasneu tr. line bw loc no. 6 and 7 at railway track crossing between railway tp point 03/7 and 3/8 of ratagarh-sardarshahar section as deposit work of ms. railway (mlin/22.17) on labour rate contract basis
Read moreRoutine/breakdown maintenance of lt switchgear of bop area, permanent station lighting system, lighting transformer and cleaning of off site store and workshop of emd-ii of 2x500 mw, dtps, anpara., as per scope of work
Routine/breakdown maintenance of lt switchgear of bop area, permanent station lighting system, lighting transformer and cleaning of off site store and workshop of emd-ii of 2x500 mw, dtps, anpara, as per scope of work
Read moreOverhauling of 6.6 kv/0.4 kv switchgear, mcc, dc system etc. of unit 03
Overhauling of 6.6 kv/0.4 kv switchgear, mcc, dc system etc. of unit 03 of 3x210 mw, atps, anpara
Read moreTtps es circle mrt i annual overhauling of cwp panels system 6 6 kv ht lt switchgear system generator transformer system external auxiliary lt switchgear system in unit iii for the year 2025 2026
Ttps es circle mrt i annual overhauling of cwp panels system 6 6 kv ht lt switchgear system generator transformer system external auxiliary lt switchgear system in unit iii for the year 2025 2026
Read moreR and m of dcs up gradation of pro control based dcs system for sg package and st package including hmi in 210 mw unit 6 hpgcl ptps panipat
R and m of dcs up gradation of pro control based dcs system for sg package and st package including hmi in 210 mw unit 6 hpgcl ptps panipat
Read moreBreaking of old/damaged refractory casting of new refractory on water wall screen tube area, ltsh inlet header, scw inlet header, burner top bottom bends and all peep holes manholes of boiler during capital overhauling of unit no. 6
Breaking of old/damaged&#x0d refractory casting of new refractory on water wall screen tube area, ltsh inlet header, scw&#x0d inlet header, burner top bottom bends and all peep holes manholes of boiler during capital&#x0d overhauling of unit no. 6
Read moreMp-6119/repairing of main s...
In situ repairing of main steam valve seat and wedge of 210 mw, unit-6, ptps, panipat during overhauling as per scope of work of file no. 6119
Read moreof your Industry type