Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
G E N E R A L S R 2 0 2 5 2 6 Reconstruction Of Retaining Wall Between Ch 0/800 To 0/900 Lhs And Ch 1/100 To 1/200 Rhs On Muttil Vivekananda Hospital Edappetty Road In Wayanad District Civil Works General Civil Work
|
| Description |
G E N E R A L S R 2 0 2 5 2 6 &Amp#X0d
Reconstruction Of Retaining&Amp#X0d
Wall Between Ch 0/800 To 0/900 Lhs&Amp#X0d
And Ch 1/100 To 1/200 Rhs On Muttil&Amp#X0d
Vivekananda Hospital Edappetty&Amp#X0d
Road In Wayanad District Civil&Amp#X0d
Works General Civil Work
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2026_PWD_828071_1 |
|
Reference Number |
PWD/RB/TR/14702/2023_5_1_1/1 |
| Tender Fee | 3527 |
| EMD | 50000 |
| Tender Value | - |
| Place | WAYANAD |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1390008 |
| Start Date | January 16, 2026 16:30 |
| End Date |
Expired
24/01/2026
Expired 264 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of cd work at khopar kohani road ch. 0/900
Construction of cd work at khopar kohani road ch. 0/900
Read moreReconstruction of damaged pipe culverts - 2 nos. (ch.108/000 and 127/500), slab culverts - 4 nos. (ch.113/800, 114/900, 118/600 and 127/000), and minor bridge at ch. 15/900 on nh-927a
Reconstruction of damaged pipe culverts - 2 nos. (ch.108/000 and 127/500), slab culverts - 4 nos. (ch.113/800, 114/900, 118/600 and 127/000), and minor bridge at ch. 15/900 on nh-927a
Read moreGeneral-rp 2025-26 - bc overlay rajaji ram mohan road-bet ch 0/450-0/900-general civil work
Bc overlay
Read moreGeneral budget rectification work urgent leak rectification works of flume in oyoor distributary between ch 450 m 500 m and ch 800 m 900 m in pooyappally grama panchayath general civil work
General budget rectification work urgent leak rectification works of flume in oyoor distributary between ch 450 m 500 m and ch 800 m 900 m in pooyappally grama panchayath general civil work
Read moreConstruction of service road from ch 312.750 to 314.800 lhs and from ch 313.000 to 314.800 rhs near urla village on existing durg bypass nh-53 (old nh-06) in the state of chhattisgarh on engineering procurement and construction (epc) mode.
Construction of service road from ch 312.750 to 314.800 lhs and from ch 313.000 to 314.800 rhs near urla village on existing durg bypass nh-53 (old nh-06) in the state of chhattisgarh on engineering procurement and construction (epc) mode.
Read moreGeneral crds agly am k main vengoor br komarappadam br 26 27 annual maintenance of kalady main canal from ch 0 000 to 2 000 km vengoor branch canal from ch 2 500 to 2 950 km and komarappadam branch canal from ch 0 800 to 1 200 km for the year 2026 2
Annualmaintenance of canal
Read moreR/o rain damages on link road katal to dharamana km 0/0 to 2/800 (sh c/o u shape drain at rd 1/840 to 1/990 and wire crate in r/wall at rd 1/900 to 1/990) under pdna
R/o rain damages on link road katal to dharamana km 0/0 to 2/800 (sh c/o u shape drain at rd 1/840 to 1/990 and wire crate in r/wall at rd 1/900 to 1/990) under pdna
Read moreInstallation of street light, high mast light on vulnerable location and other road safety work between ch. 0/00 to 91/00 and junction improvement at ch. 27/900 to 28/300 (ran ghati) on nh-58e including road safety work on nh-58e
Installation of street light, high mast light on vulnerable location and other road safety work between ch. 0/00 to 91/00 and junction improvement at ch. 27/900 to 28/300 (ran ghati) on nh-58e including road safety work on nh-58e
Read moreRrd on chail moviseri road km 0/00 to 11/200 (sh c/o b/wall at rd 5/900 to 5/910, edge wall at km. 7/800 to 7/810 and cutting 7/810 to 7/850)
Rrd on chail moviseri road km 0/00 to 11/200 (sh c/o b/wall at rd 5/900 to 5/910, edge wall at km. 7/800 to 7/810 and cutting 7/810 to 7/850)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreof your Industry type