Tender Details
Particulars | Details |
---|---|
Title |
Deputation Of Field Service Engineer For Supervision During Overhauling Of Hp Turbine And Ip Turbine Stop, Control Valves (Rexroth Make) Of Unit 1, 660 Mw (Kwu Design) At Ntpc North Karanpura Site, Jharkhand .
|
Description |
Deputation Of Field Service Engineer For Supervision During Overhauling Of Hp Turbine And Ip Turbine Stop, Control Valves (Rexroth Make) Of Unit 1, 660 Mw (Kwu Design) At Ntpc North Karanpura Site, Jharkhand .
|
Organisation | Bharat Heavy Electricals Limited | Central Govt. Ministry/Department |
Tender Id | 2025_BHEL_792473_1 |
Reference Number |
PSER-PUR-NKP-S596-24 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | UNIT-1, 660 MW (KWU DESIGN) AT NTPC-NORTH KARANPUR |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1096924 |
Start Date | March 17, 2025 22:40 |
End Date |
19/03/2025 ( Expired 32 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Thermal insulation of steam lines feed water lines lphs hphs valves nrvs during capital overhauling of turbine of unit no 6 2x250 mw ptpp parichha
Thermal insulation of steam lines feed water lines lphs hphs valves nrvs during capital overhauling of turbine of unit no 6 2x250 mw ptpp parichha
Read moreDetailed design, engineering, supply, installation, testing and commissioning of rack and pinion type stack elevator for 2 nos. of 150 meter high reinforced concrete single steel flue chimney unit 1 2 of fgd system at 3 660 mw north karanpura
Detailed design, engineering, supply,
 installation testing and commissioning of rack
 and pinion type stack elevator for 2 nos. of 150
 meter high reinforced concrete single steel flue
 chimney unit 1 2 of fgd system at 3 660
 mw north karanpura
Read moreWork contract for supply and application of pad/quilt type ceramic fibre pad/blanket insulation on bhel make kwu design 600 mw hp turbine casing and associated stop valves and control valves at 2x600 mw, sstpp, mppgcl, dongalia.
Work contract for supply and application of pad/quilt type ceramic fibre pad/blanket insulation on bhel make kwu design 600 mw hp turbine casing and associated stop valves and control valves at 2x600 mw, sstpp, mppgcl, dongalia.
Read moreCapital overhauling of 210 mw, kwu turbine and generator and associated jobs of unit-2 ttps, lalpania, jharkhand.
Capital overhauling of 210 mw, kwu turbine and generator and associated jobs of unit-2 ttps, lalpania, jharkhand.
Read moreDeputation of expert for supervision during complete overhauling work of 250 mw bhel make air pre heater a and b of unit 8
Deputation of expert for supervision during complete overhauling work of 250 mw bhel make air pre heater a and b of unit 8
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreDeputation of field service engineer for supervision during overhauling of hp turbine and ip turbine stop, control valves (rexroth make) of unit-1, 660 mw (kwu design) at ntpc-north karanpura site, jharkhand .
Deputation of field service engineer for supervision during overhauling of hp turbine and ip turbine stop, control valves (rexroth make) of unit-1, 660 mw (kwu design) at ntpc-north karanpura site, jharkhand .
Read moreCapital overhauling of hp, ip, lp turbine and generator along with associated systems including drive turbine of bfp (1 no.) insatalled at btps-1x500 mw (kwu design) dvc, bokaro, jharkhand.
Capital overhauling of hp, ip, lp turbine and generator along with associated systems including drive turbine of bfp (1 no.) insatalled at btps-1x500 mw (kwu design) dvc, bokaro, jharkhand.
Read moreDeputation of field service engineer for supervision during overhauling of hp bypass stop, control valves (imi bopp and reuther make) and hp bypass spray valves of unit-1, 660 mw (kwu design) at ntpc-north karanpura site, jharkhand .
Deputation of field service engineer for supervision during overhauling of hp bypass stop, control valves (imi bopp and reuther make) and hp bypass spray valves of unit-1, 660 mw (kwu design) at ntpc-north karanpura site, jharkhand .
Read moreWork contract for deployment of expert supervisory service for overhauling of hora make aprds ht header pressure control valves installed in unit-2 at 2x600 mw, sstpp, mppgcl, dongalia
Work contract for deployment of expert supervisory service for overhauling of hora make aprds ht header pressure control valves installed in unit-2 at 2x600 mw, sstpp, mppgcl, dongalia
Read moreof your Industry type