Title |
Deputation Of Field Service Engineer For Supervision During Overhauling Of Hp Bypass Stop, Control Valves (Imi Bopp And Reuther Make) And Hp Bypass Spray Valves Of Unit 1, 660 Mw (Kwu Design) At Ntpc North Karanpura Site, Jharkhand .
|
Description |
Deputation Of Field Service Engineer For Supervision During Overhauling Of Hp Bypass Stop, Control Valves (Imi Bopp And Reuther Make) And Hp Bypass Spray Valves Of Unit 1, 660 Mw (Kwu Design) At Ntpc North Karanpura Site, Jharkhand .
|
Organisation | Bharat Heavy Electricals Limited | Central Govt. Ministry/Department |
Tender Id | 2025_BHEL_790714_1 |
Reference Number |
PSER-PUR-NKP-S594-24 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | UNIT-1, 660 MW (KWU DESIGN) AT NTPC-NORTH KARANPUR |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1095142 |
Start Date | February 28, 2025 22:40 |
End Date |
10/03/2025 ( Expired 106 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Overhauling of turbine (all modules), hp module replacement, valves and auxiliary works and overhauling of generator, top bar replacement of generator stator winding (if required) and other associated work of unit-7, 250 mw (kwu design) at chandrapur
Overhauling of turbine (all modules), hp module replacement, valves and auxiliary works and overhauling of generator, top bar replacement of generator stator winding (if required) and other associated work of unit-7, 250 mw (kwu design) at chandrapur
Read moreOverhauling of turbine all modules, hp module replacement, valves and auxiliary works and overhauling of generator, top bar repl. of generator stator winding, if reqd. and other ass. work of u-7, 250 mw kwu design at chandrapura tps, dvc, jharkhand.
Overhauling of turbine all modules, hp module replacement, valves and auxiliary works and overhauling of generator, top bar repl. of generator stator winding, if reqd. and other ass. work of u-7, 250 mw kwu design at chandrapura tps, dvc, jharkhand.
Read moreKtps-v-tm-supervisory charges for 2 no of service engineers for overhauling of hp bypass main valves(bp1bp2) (model:ars100), hp bypass spray valves(bpe1,bpe2 bd) (model:e32s) and hp bypass oil supply units (model:ov 32 b) in unit-ix during aoh 2025-26.
Ktps-v-tm- supervisory charges for 2 no of service engineers for overhauling of hp bypass main valves(bp1 and bp2) (model:ars100), hp bypass spray valves(bpe1,bpe2 and bd) (model:e32s) and hp bypass oil supply units (model:ov 32 b) in unit-ix during aoh 2025-26.-reg.
Read moreMtps i tm unit i complete overhauling of hp bypass lp bypass spray valves oil supply unit during aoh 2025 2026
Mtps i tm unit i complete overhauling of hp bypass lp bypass spray valves oil supply unit during aoh 2025 2026
Read moreWork contract for supply and application of pad/quilt type ceramic fibre pad/blanket insulation on bhel make kwu design 600 mw hp turbine casing and associated stop valves and control valves at 2x600 mw, sstpp, mppgcl, dongalia.
Work contract for supply and application of pad/quilt type ceramic fibre pad/blanket insulation on bhel make kwu design 600 mw hp turbine casing and associated stop valves and control valves at 2x600 mw, sstpp, mppgcl, dongalia.
Read moreDeputation of expert for supervision during complete overhauling work of 250 mw bhel make air pre heater a and b of unit 8
Deputation of expert for supervision during complete overhauling work of 250 mw bhel make air pre heater a and b of unit 8
Read moreDeputation of field service engineer for supervision during overhauling of hp turbine and ip turbine stop, control valves (rexroth make) of unit-1, 660 mw (kwu design) at ntpc-north karanpura site, jharkhand .
Deputation of field service engineer for supervision during overhauling of hp turbine and ip turbine stop, control valves (rexroth make) of unit-1, 660 mw (kwu design) at ntpc-north karanpura site, jharkhand .
Read moreCapital overhauling of hp, ip, lp turbine and generator along with associated systems including drive turbine of bfp (1 no.) insatalled at btps-1x500 mw (kwu design) dvc, bokaro, jharkhand.
Capital overhauling of hp, ip, lp turbine and generator along with associated systems including drive turbine of bfp (1 no.) insatalled at btps-1x500 mw (kwu design) dvc, bokaro, jharkhand.
Read moreDeputation of field service engineer for supervision during overhauling of hp bypass stop, control valves (imi bopp and reuther make) and hp bypass spray valves of unit-1, 660 mw (kwu design) at ntpc-north karanpura site, jharkhand .
Deputation of field service engineer for supervision during overhauling of hp bypass stop, control valves (imi bopp and reuther make) and hp bypass spray valves of unit-1, 660 mw (kwu design) at ntpc-north karanpura site, jharkhand .
Read moreOverhauling of lp turbine, blade nft and mpi, bearing inspection, and valve overhauling, generator and auxiliary works of unit-1, 660 mw (kwu design) at nkstpp, ntpc, jharkhand.
Overhauling of lp turbine, blade nft and mpi, bearing inspection, and valve overhauling, generator and auxiliary works of unit-1, 660 mw (kwu design) at nkstpp, ntpc, jharkhand.