Tender Details

Particulars Details
Title
Ip Turbine Rotor Kwu 250 Mw Consisting Of Ip Shaft Drawing No. 01020157000 Blade Plan Of Ipt Drawin
Description
Ip Turbine Rotor Kwu 250 Mw Consisting Of Ip Shaft Drawing No. 01020157000 Blade Plan Of Ipt Drawin
Organisation Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) Lucknow | Energy Department Uttar Pradesh
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value -
Place
Link Login to view
Start Date October 17, 2026 22:38
End Date
Open 27/10/2026

6 days left

Search Similar tenders?

Bidding on this tender?

Partners, bid preparation, supplier quotes and GeM registration, from our team and partners.

Similar Tenders
Procurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.

Procurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.

Read more
Spares for hpt assembly fixtures 210 mw kwu turbine

Spares for hpt assembly fixtures 210 mw kwu turbine

Read more
Procurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra

Procurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra

Read more
Reconditioning refurbishment of rotor blade row1 of 13 d2 gas turbine of

Reconditioning refurbishment of rotor blade row1 of 13 d2 gas turbine ofntpc anta

Read more
Custom bid for services - lpt last stage blade mpi/nft , ipt overhauling, inspection of bearings, valves, mop etc and generator oh of u-1, 250 mw nspcl bhilai

Custom bid for services - lpt last stage blade mpi/nft , ipt overhauling, inspection of bearings, valves, mop etc and generator oh of u-1, 250 mw nspcl bhilai

Read more
Supply of materials for“ turbine supervisory & vibration monitoring system for 3 x 210 mw, kwu turbi,installation, testing & commissioning of“ turbine supervisory & vibration monitoring system for 3 x

Supply of materials for“ turbine supervisory & vibration monitoring system for 3 x 210 mw, kwu turbi,installation, testing & commissioning of“ turbine supervisory & vibration monitoring system for 3 x

Read more
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit repairing of hydraulic speed governor for 210 mw kwu turbine of 3x210 mw atps anpara service provider

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit repairing of hydraulic speed governor for 210 mw kwu turbine of 3x210 mw atps anpara service provider

Read more
Restoration of stg (133 mw) - dismantling and re-assembly of hip turbine and other associated works including packing and loading of hip rotor at site, demobilisation and remobilization and unloading of hip rotor at kpc gpcl- yelahanka ccpp (1x370mw)

Restoration of stg (133 mw) - dismantling and re-assembly of hip turbine and other associated works including packing and loading of hip rotor at site, demobilisation and remobilization and unloading of hip rotor at kpc gpcl- yelahanka ccpp (1x370mw)

Read more
Annual maintenance contract for turbine and auxiliaries including cooling towers of 250 mw unit 8 300 mw unit 7 plant water package system unit 7 and 8 and raw water intake of unit 8 dpps dpl

Annual maintenance contract for turbine and auxiliaries including cooling towers of 250 mw unit 8 300 mw unit 7 plant water package system unit 7 and 8 and raw water intake of unit 8 dpps dpl

Read more
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required

Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required

Read more

Can't bid on this alone?

Short of the turnover, experience or certification it asks for, or need a team where the work is? We'll find a JV, consortium or local partner.

Find a partner →

Get tenders for your business

Tell us what you supply or do. We'll send you matching tenders and call you about them.

Free tender checklists for your industry →