Tender Details

About Tender

🏫 Procurement Opportunity: Cooler And Cooler Duct With Installation Services 🌡️🛠️ The Public Health And Family Welfare Department Of Madhya Pradesh Is Seeking Bids For The Supply And Installation Of Coolers And Cooler Ducts. 🚨 📅 Bid Submission Deadline: April 04, 2024, 1:00 Pm This Procurement Is Aimed At Enhancing The Cooling Infrastructure Within Government Facilities. Interested Bidders Should Submit Detailed Proposals, Including Technical Specifications, Pricing, And Installation Methodologies, In Accordance With The Project's Requirements. Keywords: Cooler, Cooler Duct, Installation Services, Public Health And Family Welfare Department Madhya Pradesh, Government Procurement, Hvac Equipment
Particulars Details
Title
Cooler,Cooler Duct With Installation
Description
Organisation Public Health and Family Welfare Department Madhya Pradesh |
Tender Id GEM/2024/B/4859649
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date April 13, 2024 17:57
End Date
Expired 04/05/2024

Expired 884 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years
Buyer Name: Mohan Bhatnagar
Department: Public Health And Family Welfare Department Madhya Pradesh
Organisation: Health Department,madhya Pradesh

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 M/S DIVYANSH TRADERS Make : NA Model : NA Title : Window Film For Glass 06-05-2024 14:06:22 MII Disqualified
2 M/S RAJ ENTERPRISES Make : NA Model : NA Title : COOLER 06-05-2024 13:59:19 MII Qualified
3 SHRI GANESH ENTERPRISES Make : NA Model : NA Title : COOLER 06-05-2024 14:02:43 MII Qualified
Similar Tenders
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities

Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities

Read more
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds

Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds

Read more
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Read more
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise