Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Kmc/Dr/Pbps/M 17/2024 2025
|
Description |
Thorough Repairing Of Dilapidated M.S Platform Structures With Stair Case For Incoming Channels Of Pump Unit G, H, I Along With Delivery Gate Sump Of F Pump Unit And Other Allied Works At Dwf Station Of Pbps(drg.)/S And D.
|
Organisation | KOLKATA MUNICIPAL CORPORATION | State Govt. and UT |
Tender Id | 2025_KMC_830833_1 |
Reference Number |
KMC/DR/PBPS/M-17/2024-2025 |
Tender Fee | 0 |
EMD | 10000 |
Tender Value | |
Place | 6/1 Palmar bazar road, Kolkata-700015 |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1850240 |
Start Date | March 29, 2025 22:30 |
End Date |
09/04/2025 ( Expired 73 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Kmc/dr/pbps/m-17/2024-2025
Thorough repairing of dilapidated m.s platform structures with stair case for incoming channels of pump unit g, h, i along with delivery gate sump of f pump unit and other allied works at dwf station of pbps(drg.)/s and d.
Read moreHydraulic puller consisting of hydraulic pump, hydraulic pressure pipe & split hydraulic puller with 2/3 leg puller yoke as per following technical details:- a) capacity -20 ton b) max. spread-up to 450 mm c) minimum pread-175 mm d) minimum reach- 100 mm or lesser e) max reach -300 mm (max) f) hydraulic stroke:75 to 100 mm minimum. g) pressure-700 bar. h) number of jaw -02 of 06 nos.(01 with puller and 01 spare.) i) weight- 32 kg approx. j)body made of steel. k) pressure
For complete deion and other details, please refer to tender
Read moreHydraulic puller consisting of hydraulic pump, hydraulic pressure pipe & split hydraulic puller with 2/3 leg puller yoke as per following technical details:- a) capacity -20 ton b) max. spread-up to 450 mm c) minimum pread-175 mm d) minimum reach- 100 mm or lesser e) max reach -300 mm (max) f) hydraulic stroke:75 to 100 mm minimum. g) pressure-700 bar. h) number of jaw -02 of 06 nos.(01 with puller and 01 spare.) i) weight- 32 kg approx. j)body made of steel. k) pressure
For complete deion and other details, please refer to tender
Read moreHydraulic puller consisting of hydraulic pump, hydraulic pressure pipe & split hydraulic puller with 2/3 leg puller yoke as per following technical details:- a) capacity -20 ton b) max. spread-up to 450 mm c) minimum pread-175 mm d) minimum reach- 100 mm or lesser e) max reach -300 mm (max) f) hydraulic stroke:75 to 100 mm minimum. g) pressure-700 bar. h) number of jaw -02 of 06 nos.(01 with puller and 01 spare.) i) weight- 32 kg approx. j)body made of steel. k) pressure
For complete deion and other details, please refer to tender
Read moreAxial fan suitable for working on 110v ac 50 hz supply. the fan shall meet the following requirement: (a) air volume 325 cmh (free air delivery) (b) power input: 41 watts (c) voltage 110v ac (d) frequency: 50 hz (e) class of insulation : class b (f) noise level 50 db (max) (g) material (i) body-die cast aluminimum (ii) blade sheet steel/glass fitted polycarbonate with ul 94 with v0 rating (h) finish : electrostatically varnish (black) (i) overall dimension of the fan shall be as per icf drg no
For complete deion and other details, please refer to tender
Read moreProviding installation testing and commissioning of 9000 gph x 91 mtr head submersible pump along with allied works at tube well cum pumping station sector g era sainik colony under district capex
Providing installation testing and commissioning of 9000 gph x 91 mtr head submersible pump along with allied works at tube well cum pumping station sector g era sainik colony under district capex
Read moreRepair of 5 cusec discharge pump 25 mtr. head of unit no. ii along with allied works at lis burejal and repairs to electric sub station at lis seelam
Repair of 5 cusec discharge pump 25 mtr. head of unit no. ii along with allied works at lis burejal and repairs to electric sub station at lis seelam
Read moreRepair of 1.0 lac gph x 122mtrx 300 hp (unit -04) head pumping unit installed at central pumping station medical (pump room 1) along with allied works
Repair of 1.0 lac gph x 122mtrx 300 hp (unit -04) head pumping unit installed at central pumping station medical (pump room 1) along with allied works
Read moreRepair of 1.0 lac gph x 122mtrx 300 hp (unit- 02) head pumping unit installed at central pumping station medical (pump room 1) along with allied works
Repair of 1.0 lac gph x 122mtrx 300 hp (unit- 02) head pumping unit installed at central pumping station medical (pump room 1) along with allied works
Read moreRepair of 1.0 lac gph x 122mtrx 370 hp (unit-01) head pumping unit installed at central pumping station medical (pump room 1) along with allied works
Repair of 1.0 lac gph x 122mtrx 370 hp (unit-01) head pumping unit installed at central pumping station medical (pump room 1) along with allied works
Read moreof your Industry type