Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rehabilitation And Upgradation Of 4 Lane Road With Paved Shoulders Of Barshi Takli Bypass (Nh 161 A) From Design Km. 0.000 To Km.3.160 (Total Length 3.160 Km) In The State Of Maharashtra On Epc Basis Mode
|
| Description |
Rehabilitation And Upgradation Of 4 Lane Road With Paved Shoulders Of Barshi Takli Bypass (Nh 161 A) From Design Km. 0.000 To Km.3.160 (Total Length 3.160 Km) In The State Of Maharashtra On Epc Basis Mode
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_830529_1 |
|
Reference Number |
12/EENH/AKL/2024-25, Dt.11/10/2024 |
| Tender Fee | 11800 |
| EMD | 1.07 Crore |
| Tender Value | |
| Place | Barshi Takli Bypass |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=872727 |
| Start Date | October 12, 2024 19:45 |
| End Date |
Expired
12/03/2025
Expired 475 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreEngagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreReconstruction widening strengthening of belhe shirur from single lane intermediate lane and two lane to two lane with paved shoulders of nh-761 from design ch. km 0.000 to km 37.970 design length 37.970 km in the state of maharashtra on epc mode
Reconstruction widening strengthening of belhe shirur from single lane intermediate lane and two lane to two lane with paved shoulders of nh-761 from design ch. km 0.000 to km 37.970 design length 37.970 km in the state of maharashtra on epc mode
Read moreAbilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Read moreRehabilitation and upgradation of two lane road with paved shoulders length in kinkheda and linga kotwal village nh 461b from km. 25.900 to 28.775 (in 5 nos stretch total length 1.475 km) in the state of maharashtra epc mode
Rehabilitation and upgradation of two lane road with paved shoulders length in kinkheda and linga kotwal village nh 461b from km. 25.900 to 28.775 (in 5 nos stretch total length 1.475 km) in the state of maharashtra epc mode
Read moreMaintenance of rehabilitation upgradation of digras darwha karanja nh 361c r from km 0.000 to 74.351 to lane two paved shoulder on epc mode in the state of maharashtra
Maintenance of rehabilitation upgradation of digras darwha karanja nh 361c r from km 0.000 to 74.351 to lane two paved shoulder on epc mode in the state of maharashtra
Read moreof your Industry type