Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of 154 Nos. Of Computers Systems To Singareni Collieries Educational Society.
|
| Description |
Procurement Of 154 Nos. Of Computers Systems To Singareni Collieries Educational Society.
|
| Organisation | THE SINGARENI COLLIERIES COMPANY LIMITED-Corp-MP |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | 1.24 Crore |
| Place | Telangana |
| Link | Login to view |
| Start Date | October 09, 2026 17:00 |
| End Date |
Open
16/10/2026
5 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of items required for maintenance of man riding systems working at vkp mine, rg-ii area.
Procurement of items required for maintenance of man riding systems working at vkp mine, rg-ii area.
Read moreProcurement of elgi make spares for screw type air compressors of bobrn wagon unloading and dry fog dust suppression systems working in chp at stpp, jaipur, mancherial, telangana
Procurement of elgi make spares for screw type air compressors of bobrn wagon unloading and dry fog dust suppression systems working in chp at stpp, jaipur, mancherial, telangana
Read moreProcurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg
Procurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreGeneral electrical wiring and maintenance works to office buildings, area hospital and residential quarters in pv township, etc. for a period of 02 years on rate contract basis at manuguru area - reg.
General electrical wiring and maintenance works to office buildings, area hospital and residential quarters in pv township, etc. for a period of 02 years on rate contract basis at manuguru area - reg.
Read moreTransportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system
Transportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system
Read moreof your Industry type