Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🔋 Procurement Opportunity: Apfc Panel With Current Transformer 🔋 The Department Of Electronics And Information Technology, Under The Ministry Of Electronics And Information Technology, Is Seeking To Establish A Panel Of Vendors For The Supply Of Apfc (Active Power Filter With Current Transformer) Units. 📅 Submission Deadline: April 05, 2024, 6:00 Pm Interested Vendors Must Provide Detailed Technical And Financial Bids, Demonstrating Their Capability To Supply High Quality Apfc Panels With Current Transformers As Per The Specified Requirements. Keywords: Apfc Panel, Current Transformer, Power Electronics, Government Procurement, Electronics And Information Technology, Vendor PanelParticulars | Details |
---|---|
Title |
Apfc Panel With Current Transformer
|
Description |
|
Organisation | Department of Electronics and Information Technology | Ministry of Electronics and Information Technology |
Tender Id | GEM/2024/B/4783664 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | March 15, 2024 16:20 |
End Date |
05/04/2024 ( Expired 452 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
---|---|---|---|---|---|
1 | DEALCRAFT CORPORATION | Make : LUBI ELECTRONICS Model : LUBI ELECTRONICS Title : APFC PANEL AND CT | 03-04-2024 18:26:16 | MII | Qualified |
2 | ELITO ENERGY PRIVATE LIMITED | Make : NA Model : DMAK Title : 500 KVAR APFC PANEL | 05-04-2024 11:30:17 | MII | Qualified |
3 | HELICAL ENGINEERS | Make : Helical Engineers Model : APFC 50 Title : APFC Panel 50kVAR | 01-04-2024 15:31:23 | MII | Disqualified |
4 | M / S SOHAL ENGINEERS | Make : SOHAL ENGINEERS NAGPUR Model : SOHAL ENGINEERS NAGPUR Title : 500KVAR APFC PANEL | 31-03-2024 17:15:44 | MII | Disqualified |
5 | POWERFORCE CORPORATION | Make : POWERFORCE Model : APFC350 Title : CAPACITOR BANK 350KVAR | 05-04-2024 17:53:53 | MII MSE | Qualified |
6 | RAHSAN ENGINEERING | Make : RAHSAN ENGINEERING Model : APFC PANEL Title : APFC PANEL | 04-04-2024 18:00:34 | MII MSE | Qualified |
7 | S.S. POWER CONTROL | Make : S.S. POWER CONTROL Model : NA Title : 700 KVAR APFC Panels | 29-03-2024 12:42:13 | MII MSE | Qualified |
8 | SUPER ELMECH ENGINEERS PRIVATE LIMITED | Make : SUPER ELMECH ENGINEERS PVT. LTD. Model : SEEPL Title : APFC PANEL | 05-04-2024 11:57:40 | MII MSE | Qualified |
Contract Details
- Contract Status:
- Order Accepted
- Seller:
- POWERFORCE CORPORATION
- Buyer Designation:
- Purchase Officer
- Buying Mode:
- Bid/RA
- Contract Date:
- 2024-10-03 23:38:00 +0530
- Contract Amount:
- 660200
Product | Brand | Model | Ordered Quantity | Price |
---|---|---|---|---|
CAPACITOR BANK 350KVAR | POWERFORCE | APFC350 | 1 | ₹ 660200.000 |
Mr pressure injector syringe kit with tubing compatible with bayer mr pressure injector
Procurement of mr pressure injector syringe kit with tubing compatible with bayer mr pressure injector for the dept. of radio-diagnosis, aiims kalyani
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreRfs for setting up 1200 mw ists-connected spv power projects with 600mw/3600mwh ess (seci-ists-xxi)
Rfs for setting up 1200 mw ists-connected spv power projects with 600mw/3600mwh ess (seci-ists-xxi)
Read moreConsultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti
Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreConstruction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Read moreof your Industry type