Tender Details

Particulars Details
Title
Tggenco
Description
Btps Chp Removal Of Spilled Over Coal, Fine Dust And Wet Coal At Head End Area Of Bcn 1 Ab At Tp 1 Including Fg Floor, Gallery Area, Mh 2, Module 1 To 10 And Tail End Area At Mh 1 Including Hgtu By Head Loads On To Running Conveyor Required In Mm/Chp/Btps From 01.12.2025 Or Actual Date Of Commencement Of Work To 31.03.2026.
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id 643484
Reference
Number
e-39/2025-26 of CE/Const/BTPS(SE/CHP/BTPS)
Tender Fee 209
EMD 8850
Tender Value -
Place TS
Link
View Original Tender Notice

http://eprocurement.telangana.gov.in/

Start Date November 14, 2025 23:00
End Date
Expired 28/11/2025

Expired 323 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tripper pulley for chp,snub pulley for chp,drive pulley for chp,bend pulley for cc-133,drive pulley for cc-133,head pulley for cc-133,take up pulley for cc-133,tail end pulley for cc-133,bend pulley for chp

Tripper pulley for chp,snub pulley for chp,drive pulley for chp,bend pulley for cc-133,drive pulley for cc-133,head pulley for cc-133,take up pulley for cc-133,tail end pulley for cc-133,bend pulley for chp

Read more
Supply of end cover of coal crusher motor 525kw for chp btps, obra

Supply of end cover of coal crusher motor 525kw for chp btps, obra

Read more
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Read more
Re-handling of spilled coal around 303 and 304 belt conveyor, tail end gallery and head end and 307 and 308 shuttle conveyor main plant of kedla washery.

Re-handling of spilled coal around 303 and 304 belt conveyor, tail end gallery and head end and 307 and 308 shuttle conveyor main plant of kedla washery.

Read more
Re-handling of spilled coal around 303 and 304 belt conveyor, tail end gallery and head end and 307 and 308 shuttle conveyor main plant of kedla washery.

Re-handling of spilled coal around 303 and 304 belt conveyor, tail end gallery and head end and 307 and 308 shuttle conveyor main plant of kedla washery.

Read more
Repairing of damage brick drain between rail tracks at post tippler near buffer end near 6c head end of chp area at ktps

Repairing of damage brick drain between rail tracks at post tippler near buffer end near 6c head end of chp area at ktps

Read more
Repairing, replacement of structures of ground floor of transfer point 1104 and tail end to head end of conveyors 1016 and 1017 under chp/cpp, piparwar area.

Repairing, replacement of structures of ground floor of transfer point 1104 and tail end to head end of conveyors 1016 and 1017 under chp/cpp, piparwar area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise