Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
57/Ee/Amritsar/2024 25
|
| Description |
Raising Boundary Wall Of Left, Right Back Side Over Portion At Plant Quarantine Building At Rajasansi Amritsar.
|
| Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
| Tender Id | 91557 |
|
Reference Number |
57/EE/AMRITSAR/2024-25 |
| Tender Fee | 0 |
| EMD | 11411 |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=6370776424637077642439313535372435372f45452f414d5249545341522f323032342d3235 |
| Start Date | October 15, 2024 17:25 |
| End Date |
Expired
22/10/2024
Expired 727 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fog light kit innova,back light assy left side innova,back light assy right side innova,wind shield glass innova,starter motor assy innova,fuel filter innova,side mirror with indicstor left side innova,side mirror with indicstor right side innova,engine oil cooler innova
Fog light kit innova,back light assy left side innova,back light assy right side innova,wind shield glass innova,starter motor assy innova,fuel filter innova,side mirror with indicstor left side innova,side mirror with indicstor right side innova,engine oil cooler innova
Read moreSpecial repair/emergent repair work for the left out portion of nh-120 (dumraon bazar) from ch. 240.200 to ch. 245.400 (excluding portion of 940m handed over to bsrdcl) for the year 2026-27.
Special repair/emergent repair work for the left out portion of nh-120 (dumraon bazar) from ch. 240.200 to ch. 245.400 (excluding portion of 940m handed over to bsrdcl) for the year 2026-27.
Read moreConstruction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway
Construction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway
Read moreSpring charging motor for 220 kv,motor 230v ac dc type c-22,spring charging motor for 66kv,torsion spring right for 66kv,torsion spring left for 66kv,surface space heater for 66kv,thermostate for 66kv,silica gel breather 250 gram,silica gel breather 500 gram,split type arching horn,one of gasket,630a motorized changeover switch,63a 2pole 2way motorized change over switch,solid copper busbar,lighting arrester disconnector,stainless steel bolt m12x100,stainless steel bolt m12x150,silica gel blue 4 to 6 mm,25 kv drop out fuse,hot air gun,hydrometer,long barreal 70 sqmm copper lug,tie rod insulator operating rod insulator
Spring charging motor for 220 kv,motor 230v ac dc type c-22,spring charging motor for 66kv,torsion spring right for 66kv,torsion spring left for 66kv,surface space heater for 66kv,thermostate for 66kv,silica gel breather 250 gram,silica gel breather 500 gram,split type arching horn,one of gasket,630a motorized changeover switch,63a 2pole 2way motorized change over switch,solid copper busbar,lighting arrester disconnector,stainless steel bolt m12x100,stainless steel bolt m12x150,silica gel blue 4 to 6 mm,25 kv drop out fuse,hot air gun,hydrometer,long barreal 70 sqmm copper lug,tie rod insulator operating rod insulator
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreExternal finishing of cpmg office building (for right, left and back side portion of building only).
External finishing of cpmg office building (for right, left and back side portion of building only).
Read moreRestructuring the chain link fencing at front side portion, back side portion, right side portion and left side portion of p.s. compound of garubathan p.s.
Restructuring the chain link fencing at front side portion, back side portion, right side portion and left side portion of p.s. compound of garubathan p.s.
Read moreof your Industry type