Tender Details
Particulars | Details |
---|---|
Title |
Maintenance Of Smoke Stack System Of 750 Kva Dg Sets Of Substation 1 And 2 In The University Campus (2024 25)
|
Description |
Maintenance Of Smoke Stack System Of 750 Kva Dg Sets Of Substation 1 And 2 In The University Campus (2024 25)
|
Organisation | University of Calicut | State Govt. and UT |
Tender Id | 2025_UoC_733393_1 |
Reference Number |
D3/108073/ E-Tender No.22/2024-25 (Re-1) |
Tender Fee | 590 |
EMD | 1395 |
Tender Value | |
Place | University of Calicut |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1172358 |
Start Date | February 04, 2025 14:30 |
End Date |
14/02/2025 ( Expired 114 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Read moreConstruction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreAssistance in carrying out miscellaneous routine works for prive maintenance of 220kv substation, mahuakheraganj and 132kv substation jaspur under 220kv oandm division, mahuakheraganj
Assistance in carrying out miscellaneous routine works for prive maintenance of 220kv substation, mahuakheraganj and 132kv substation jaspur under 220kv oandm division, mahuakheraganj
Read more81795 provn of external electric supply to d-1 offrs md accn area and provision of recd (retrofitting emission control device) for all dg sets at nda under ge (nda) khadakwasla
81795 provn of external electric supply to d-1 offrs md accn area and provision of recd (retrofitting emission control device) for all dg sets at nda under ge (nda) khadakwasla
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreAAAAAAAAAA
Login to viewConstruction of 100 bedded st central hostel for girls at tarabag campus of burdwan university in the district of purba bardhaman. project id tw252635010s000
Read moreOperation and maintenance of 245 mld. sbr based stp, mps- 2 nos., pumping main 1400mm dia. and 33/0.415 kv substation- 2 nos. comprising of all civil, electrical, mechanical and other allied works and utilities including specified staff at kabitk
Operation and maintenance of 245 mld. sbr based stp, mps- 2 nos., pumping main 1400mm dia. and 33/0.415 kv substation- 2 nos. comprising of all civil, electrical, mechanical and other allied works and utilities including specified staff at kabitk
Read moreOne time improvement in bhoura town portion, shahpur town portion and padhar town portion on nh 69 (old) nh 46 (new) itarsi betul road in the state of madhya pradesh on epc mode
One time improvement in bhoura town portion, shahpur town portion and padhar town portion on nh 69 (old) nh 46 (new) itarsi betul road in the state of madhya pradesh on epc mode
Read moreof your Industry type